<div dir="ltr">Hello,<div><br></div><div>I was contacted by a local co-op about installing a PV system at their office.  At first they wanted a straight grid-tied system, and after they received the bid they changed their minds and now want a battery based system price. What they want now is a system that will allow them to draw the battery bank down starting at 5pm during their peak demand time. Has anyone worked on or installed a system of this type?</div>
<div><br></div><div><br></div><div>Thanks as always!</div><div><br></div><div><br></div><div>Jesse</div></div>