<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <div class="moz-cite-prefix">Depending on the original work, I'd
      look at sealed batteries and leave it alone.  I've done a bunch of
      rewires, and you're really wasting the customer's money to rewire
      80 watt modules. ( module J boxes are so 1990s....) Meanwhile
      those 80 watt modules have decent resell value for small 12 v
      systems, as does the Trace inverter.<br>
      I found that Outbacks take about 480 w-hr/ day so that's  a fair
      bit of the array just to offset that.<br>
      Small sealed battery bank, and let him play with a few backup
      circuits in off grid mode might be OK. or offer him a new GT
      system with a nice trade in allowance for the old gear.<br>
      I did a rewire recently like this, and we reused the generator 3
      way circuit selector.  That lets them pick which circuits are on
      or off the grid.  I'm sure others here will have some good ideas I
      haven't thought of too.<br>
      <pre class="moz-signature" cols="72">R.Ray Walters
CTO, Solarray, Inc
Nabcep Certified PV Installer, 
Licensed Master Electrician
Solar Design Engineer
303 505-8760</pre>
      On 6/4/2013 3:53 PM, Steven Lawrence wrote:<br>
    </div>
    <blockquote
cite="mid:CAEJy-2Q89L_XxbgXsXwm+1+K-4G88TD3__aBNiUrAFr8WvJASg@mail.gmail.com"
      type="cite">
      <div dir="ltr">
        <div class="gmail_extra">
          <div class="gmail_quote">
            <div>Dana,</div>
            <div> </div>
            <div>Maybe wire 3 in series to a single Enphase?  It'll
              depend on what the voltages are.</div>
            <div> </div>
            <div> </div>
            <blockquote style="margin:0px 0px 0px
0.8ex;padding-left:1ex;border-left-color:rgb(204,204,204);border-left-width:1px;border-left-style:solid"
              class="gmail_quote">
              Date: Tue, 4 Jun 2013 14:01:42 -0600<br>
              From: "Dana" <<a moz-do-not-send="true"
                href="mailto:dana@solarwork.com">dana@solarwork.com</a>><br>
              To: "'RE-wrenches'" <<a moz-do-not-send="true"
                href="mailto:re-wrenches@lists.re-wrenches.org">re-wrenches@lists.re-wrenches.org</a>><br>
              Subject: [RE-wrenches] Old Modules for GIT system?<br>
              Message-ID: <05f401ce615e$55773960$0065ac20$@com><br>
              Content-Type: text/plain; charset="us-ascii"<br>
              <br>
              I have a client eat has a 24 - Solarex  SX 80 PV module
              system that was off<br>
              grid, Trace inverter, APT Power panel and an very aged
              L-16 battery bank.<br>
              <br>
              The utility came in and he wants to go grid tie. It is or
              was only 960 watt<br>
              originally. I realize that an array rewire is in order and
              it may only be a<br>
              1 KW system but he is interested in getting the equipment
              upgraded.<br>
              <br>
              Has anyone done a grid tie with such a small array and
              with modules this<br>
              old?<br>
              <br>
              Any thoughts on installing sealed batteries and leaving it
              alone?<br>
              <br>
              <br>
              <br>
              <br>
              <br>
            </blockquote>
          </div>
        </div>
      </div>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
List sponsored by Home Power magazine

List Address: <a class="moz-txt-link-abbreviated" href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a>

Change email address & settings:
<a class="moz-txt-link-freetext" href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a>

List-Archive: <a class="moz-txt-link-freetext" href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a>

List rules & etiquette:
<a class="moz-txt-link-abbreviated" href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a>

Check out participant bios:
<a class="moz-txt-link-abbreviated" href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a>

</pre>
    </blockquote>
    <br>
  </body>
</html>