<div dir="ltr"><div class="gmail_extra"><div class="gmail_quote"><div>Dana,</div><div> </div><div>Maybe wire 3 in series to a single Enphase?  It'll depend on what the voltages are.</div><div> </div><div> </div><blockquote style="margin:0px 0px 0px 0.8ex;padding-left:1ex;border-left-color:rgb(204,204,204);border-left-width:1px;border-left-style:solid" class="gmail_quote">

Date: Tue, 4 Jun 2013 14:01:42 -0600<br>
From: "Dana" <<a href="mailto:dana@solarwork.com">dana@solarwork.com</a>><br>
To: "'RE-wrenches'" <<a href="mailto:re-wrenches@lists.re-wrenches.org">re-wrenches@lists.re-wrenches.org</a>><br>
Subject: [RE-wrenches] Old Modules for GIT system?<br>
Message-ID: <05f401ce615e$55773960$0065ac20$@com><br>
Content-Type: text/plain; charset="us-ascii"<br>
<br>
I have a client eat has a 24 - Solarex  SX 80 PV module system that was off<br>
grid, Trace inverter, APT Power panel and an very aged L-16 battery bank.<br>
<br>
The utility came in and he wants to go grid tie. It is or was only 960 watt<br>
originally. I realize that an array rewire is in order and it may only be a<br>
1 KW system but he is interested in getting the equipment upgraded.<br>
<br>
Has anyone done a grid tie with such a small array and with modules this<br>
old?<br>
<br>
Any thoughts on installing sealed batteries and leaving it alone?<br>
<br>
<br>
<br>
<br>
<br>
</blockquote></div></div></div>