<div dir="ltr">That's good news! I'd like to keep Zep in the arsenal, especially for people that insist on a low profile look. One other thing that concerns me a bit is the long-term availability and replacements down the road. We've had this discussion in another thread about replacing 12V nominal modules. That's an electrical compatibility issue, but Zep may create another compatibility issue that can't easily be resolved. In the case of Zep with microinverters, if a module fails or breaks in the distant future and there is no replacement available, you can just say "oh well" and let it be. That's my argument for only using Zep with micros, not string inverters. Then again, that's a compelling argument for using micros in general.<div>

<br></div><div>There are definitely pros and cons to this unique mounting system.<br><br><div id="WISESTAMP_SIG_gmail_session"><div style="font-size:13px;font-family:Verdana,Arial,Helvetica,sans-serif"><div style="margin:0 0 8px 0">

<p style="margin:0"><span style="color:#808080"><strong>Jason Szumlanski</strong><em> </em></span></p><p style="margin:0"><span style="color:#808080"><em>Fafco Solar<br></em></span><br></p></div></div></div><div class="gmail_extra">

<br><br><div class="gmail_quote">On Fri, Jan 25, 2013 at 12:01 AM, Andrew Truitt <span dir="ltr"><<a href="mailto:atruitt@gmail.com" target="_blank">atruitt@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">

<div dir="ltr"><div>Jason - This is from Nate Colman, PE and Director of Technical Development at Zep:<br><br><span style="font-size:11pt;font-family:"Calibri","sans-serif";color:rgb(31,73,125)">Zep
 Solar will be providing updated span tables and compliance letters 
based on ASCE-10 in the next few weeks.  Regarding removal of modules 
for service - it is common practice to remove up roof modules in order 
to gain access to a module requiring service, regardless of the mounting
 system.  Zep’s recommended practices for module removal are detailed 
within our installation manuals.  Please note that Zep Solar does not 
promote walking across arrays in order to remove a module for servicing,
 as this may result in damage to the cells.  Regarding microinverter 
installations - Zep Solar continues to design innovative products for 
the installation of module device electronics that will simplify the 
integration and mounting of these devices in Zep arrays<br><br><br><div><div class="im"><div><p><span style="color:rgb(0,102,0)">For a brighter energy future,<br><br><br>Andrew Truitt <br>NABCEP Certified PV Installer</span><span style="font-size:10pt;font-family:Arial,sans-serif;color:rgb(0,102,0)">™</span><span style="color:rgb(0,102,0)"> (ID# 032407-66)</span></p>






</div><div><p><span style="color:rgb(0,102,0)">Principal<br>Truitt Renewable Energy Consulting, LLC</span></p></div><div><p><span style="color:rgb(0,102,0)"><a href="tel:%28202%29%20486-7507" target="_blank"><span style="color:rgb(17,85,204)">(202) 486-7507</span></a></span></p>




<p><a href="http://www.linkedin.com/pub/andrew-truitt/8/622/713" target="_blank">LinkedIn Profile</a></p><p><a href="http://truittreconsulting.weebly.com/" target="_blank">Company Website</a><br><span style="color:rgb(0,102,0)"><a href="tel:%28202%29%20486-7507" target="_blank"><span style="color:rgb(17,85,204)"></span></a></span></p>






</div></div><p><span style="color:rgb(20,125,186)"></span><br>
<br></p><div class="im"><span style="color:rgb(20,125,186)"><br></span>"Don't get me wrong: I love nuclear energy! It's just that I prefer fusion to fission. And it just so happens that there's an enormous fusion reactor safely banked a few million miles from us. It delivers more than we could ever use in just about 8 minutes. And it's wireless!"<br>






<br>~William McDonough</div><p></p><div><div><br></div></div></div>
<br>
<br>
<br></span></div><div><div class="h5"><div class="gmail_extra"><br><br><div class="gmail_quote">On Mon, Jan 21, 2013 at 8:34 AM, Jason Szumlanski <span dir="ltr"><<a href="mailto:jason@fafcosolar.com" target="_blank">jason@fafcosolar.com</a>></span> wrote:<br>



<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><br>Despite the fact that Unirac has not updated its manual for ASCE 7-10, the span tables are still useful and there is adequate engineering information from them to get the job done. Solarmount is still our product of choice, despite several lower cost options like Ironridge. That could change if competitors move to lower cost options.<br>





<br><div><div style="font-size:13px;font-family:Verdana,Arial,Helvetica,sans-serif"><div style="margin:0 0 8px 0"><p style="margin:0"><span style="color:#808080"><b>Jason Szumlanski</b></span></p>

<p style="margin:0"><span style="color:#808080"><i>Fafco Solar</i></span><br><span style="color:#808080"><span></span></span></p><p style="margin:0"><span style="color:#808080"><i><br></i></span></p></div></div></div><div>



<div>

<div class="gmail_extra"><br><br><div class="gmail_quote">On Mon, Jan 21, 2013 at 10:05 AM, Chris Mason <span dir="ltr"><<a href="mailto:cometenergysystems@gmail.com" target="_blank">cometenergysystems@gmail.com</a>></span> wrote:<br>





<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr">Jason,<div>What are you using now? We look to Florida for standards, as he Caribbean doesn't have any.</div>





</div><div class="gmail_extra"><br><br><div class="gmail_quote"><div><div>On Mon, Jan 21, 2013 at 9:10 AM, Jason Szumlanski <span dir="ltr"><<a href="mailto:jason@fafcosolar.com" target="_blank">jason@fafcosolar.com</a>></span> wrote:<br>






</div></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div><div><div dir="ltr">That's based on ASCE 7-05. If your AHJ requires ASCE 7-10, that is no longer the case. Florida Building Code 2010 requires use of ASCE 7-10, and ultimate design wind speeds have changed dramatically, so it's important to consider the method, not just the wind speed.<br>









<br>We liked Zep, except when you have to remove a module for service. Microinverter installations are a little clunky with Zep, even with module frames specifically designed for Enphase. Unfortunately, we stopped using the product for a variety of reasons, not the least of which were new code requirements in Florida.<br>









<br><div><div style="font-size:13px;font-family:Verdana,Arial,Helvetica,sans-serif"><div style="margin:0 0 8px 0"><p style="margin:0"><span style="color:#808080"><b>Jason Szumlanski</b><i> </i></span></p>
<p style="margin:0"><span style="color:#808080"><i>Fafco Solar</i></span><br><br></p></div></div></div><div class="gmail_extra"><br><div class="gmail_quote"><div>On Sat, Jan 19, 2013 at 5:52 PM, Andrew Truitt <span dir="ltr"><<a href="mailto:atruitt@gmail.com" target="_blank">atruitt@gmail.com</a>></span> wrote:<br>









</div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><div><div><div><div><br></div>Chris - The Zep system can be installed in up to 150mph wind zones in most cases.  See the span tables on the Zep engineering documentation:  <a href="http://www.zepsolar.com/images/files/general/pdf/ZS_Compliance_Letter.pdf" target="_blank">http://www.zepsolar.com/images/files/general/pdf/ZS_Compliance_Letter.pdf</a><br>











<br></div>Todd - Ground snow loads of up to 70 psf are allowable. <br><br><br></div><div>A free design tool can be found at <a href="http://zepulator.com" target="_blank">zepulator.com</a><div><br><div><br></div>
<div>
<div>
<p class="MsoNormal"><span style="color:rgb(0,102,0)">For a brighter energy future,<br><br><br>Andrew Truitt <br>NABCEP Certified PV Installer</span><span style="font-size:10pt;font-family:Arial,sans-serif;color:rgb(0,102,0)">™</span><span style="color:rgb(0,102,0)"> (ID# 032407-66)</span><u></u><u></u></p>














</div><div><p class="MsoNormal"><span style="color:rgb(0,102,0)">Principal<br>Truitt Renewable Energy Consulting, LLC</span><u></u><u></u></p></div><div><p class="MsoNormal"><span style="color:rgb(0,102,0)"><a href="tel:%28202%29%20486-7507" target="_blank"><span style="color:rgb(17,85,204)">(202) 486-7507</span></a></span></p>












<p class="MsoNormal"><a href="http://www.linkedin.com/pub/andrew-truitt/8/622/713" target="_blank">LinkedIn Profile</a></p><p class="MsoNormal"><a href="http://truittreconsulting.weebly.com/" target="_blank">Company Website</a><br>











<span style="color:rgb(0,102,0)"><a href="tel:%28202%29%20486-7507" target="_blank"><span style="color:rgb(17,85,204)"></span></a></span><u></u><u></u></p>


</div><p class="MsoNormal"><br></p></div></div></div></div></div></blockquote></div></div></div></div></div></blockquote></div></div></blockquote></div></div></div></div></div></blockquote></div></div></div></div></div></blockquote>

</div></div></div></div>