<div>I was sent to look at another contractor's work, and found three SB5000 inverters with blown string input fuses. I was able to determine the reason pretty quickly, and was later sent the original 1-Line, which was installed per the drawings. The 1-Line came from a "leading system integrator" who shall remain nameless.</div>

<div><br></div><div>See anything wrong?</div><div><br></div><div><a href="https://www.sugarsync.com/pf/D6539806_8669786_010829">https://www.sugarsync.com/pf/D6539806_8669786_010829</a></div><div><br></div><div>Just goes to show you - the contractor needs to take responsibility and verify the specifications are correct, safe, and code compliant.</div>

<br clear="all">Jason Szumlanski<div>Fafco Solar</div>