Wrenches,<div><br></div><div>Batt backup system: When placing a critical loads panel directly adjacent to the main service panel (in the next stud bay), must the neutral and ground conductors be pulled into the new subpanel? or can only the hots be pulled? Any Code references would be appreciated.</div>
<div><br></div><div>--</div><div>Corey Shalanski</div><div>Joule Energy</div><div>New Orleans, LA</div>