<html><body bgcolor="#FFFFFF"><div>Maybe you can put in a smaller main breaker? </div><div><br></div><div>Jesse<br><br>Sent from my iPhone</div><div><br>On Sep 29, 2011, at 1:39 PM, "Glenn Burt" <<a href="mailto:glenn.burt@glbcc.com">glenn.burt@glbcc.com</a>> wrote:<br><br></div><div></div><blockquote type="cite"><div><div class="WordSection1"><p class="MsoNormal"><span style="color:#1F497D">How about feeding both systems into an AC combining subpanel before feeding the main load center?<o:p></o:p></span></p><p class="MsoNormal"><span style="color:#1F497D">Often the calculations required will allow you to do more backfeeding than the simple backfeeding a load center with individual breakers.<o:p></o:p></span></p><p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p><p class="MsoNormal"><span style="color:#1F497D">-Glenn<o:p></o:p></span></p><p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p><div><div style="border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in"><p class="MsoNormal"><b><span style="font-size:10.0pt;font-family:"Tahoma","sans-serif"">From:</span></b><span style="font-size:10.0pt;font-family:"Tahoma","sans-serif""> <a href="mailto:re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a> [mailto:re-wrenches-bounces@lists.re-wrenches.org] <b>On Behalf Of </b>Jason Szumlanski<br><b>Sent:</b> Thursday, September 29, 2011 11:49 AM<br><b>To:</b> RE-wrenches<br><b>Subject:</b> [RE-wrenches] Adding on to existing PV System<o:p></o:p></span></p></div></div><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">We’ve been contracted to add on to an existing PV system in a residence. The existing system has a 30A 2P Breaker on a 200A rated panel with a 200A main breaker. The new system would require a 15A breaker, which would exceed the limit in NEC 690.64(B)(2).<o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">The existing system has a fusible AC disconnect mounted next to the meter. This was originally intended as the utility external disconnect. The utility no longer requires a disconnect, but if we do a supply side connection, we would need a fusible AC disconnect anyway for the new system. I would collocate the new disconnect with the old.<o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">Does anyone see any problem with doing a supply size connection for the new system? Any labeling snags that I might need to consider?<o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal"><span style="font-size:12.0pt">Jason Szumlanski<o:p></o:p></span></p><p class="MsoNormal">Fafco Solar<o:p></o:p></p></div></div></blockquote><blockquote type="cite"><div><span>_______________________________________________</span><br><span>List sponsored by Home Power magazine</span><br><span></span><br><span>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org"><a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a></a></span><br><span></span><br><span>Options & settings:</span><br><span><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a></span><br><span></span><br><span>List-Archive: <a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org"><a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a></a></span><br><span></span><br><span>List rules & etiquette:</span><br><span><a href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a></span><br><span></span><br><span>Check out participant bios:</span><br><span><a href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a></span><br><span></span><br></div></blockquote></body></html>