<html>
<body>
<font size=3>Friends:<br><br>
I don't know if any of you share my feelings, but I am not real
comfortable corresponding about bidding on this list, for these
reasons:<br><br>
1. I thought this list was for mechanical / electrical / technical
issues.<br>
2. Anyone would be a fool to let someone else ascertain a bid for
them.  Each contractor has different costs, techniques and
situations.<br>
3. Each job is different.  I avoid even figuring a dollar/watt ratio
for a given job, because it won't necessarily apply to the next
job..<br>
4. I want to avoid any appearance of price fixing.<br><br>
If the rest of you want to compare notes on pricing, feel free, but I
won't be participating.<br><br>
William Miller<br><br>
<br><br>
At 12:59 PM 6/10/2011, you wrote:<br>
<blockquote type=cite class=cite cite>Hello Wrenches,<br><br>
My employer has the inside track on a 1MW install on .5/12 standing seam
metal roofs (two separate roofs).  This is by far larger than
anything we've designed so I am looking for a ballpark cost/watt. I'm at
around $4/watt. I realize there are lots of variables and I am looking
for help on this but just wondering if I am in the ballpark? <br><br>
Thank you.<br><br>
Larry Liesner<br>
Design and Installations<br>
Elektron Solar, LLC<br>
16 Ketchum St.<br>
Westport, CT 06880<br>
203-557-3127 (office)<br>
203-644-2404 (cell)<br>
203-549-0977 (fax)<br>
<a href="mailto:wirewiz@gmail.com">wirewiz@gmail.com</a><br>
NABCEP Certified PV Installer (# 032611-184)</font></blockquote></body>
</html>