<table cellspacing="0" cellpadding="0" border="0" ><tr><td valign="top" style="font: inherit;">Hi Dana,<br><br>The battery and all associated equipment is being totally removed as the folks are now unable to do the required maintenance. They really love the little Air 403 and would like to interface it if at all possible even if it doesn't make economical sense.<br><br>Peter<br><br>--- On <b>Thu, 5/5/11, Dana <i><dana@solarwork.com></i></b> wrote:<br><blockquote style="border-left: 2px solid rgb(16, 16, 255); margin-left: 5px; padding-left: 5px;"><br>From: Dana <dana@solarwork.com><br>Subject: [RE-wrenches] Interfacing an Air 403 wind generator<br>To: "'RE-wrenches'" <re-wrenches@lists.re-wrenches.org><br>Date: Thursday, May 5, 2011, 1:32 PM<br><br><div id="yiv803265409"><style><!--
#yiv803265409  
 _filtered #yiv803265409 {font-family:Calibri;panose-1:2 15 5 2 2 2 4 3 2 4;}
 _filtered #yiv803265409 {font-family:Tahoma;panose-1:2 11 6 4 3 5 4 4 2 4;}
 _filtered #yiv803265409 {font-family:"Century Gothic";panose-1:2 11 5 2 2 2 2 2 2 4;}
#yiv803265409  
#yiv803265409 p.yiv803265409MsoNormal, #yiv803265409 li.yiv803265409MsoNormal, #yiv803265409 div.yiv803265409MsoNormal
        {margin:0in;margin-bottom:.0001pt;font-size:12.0pt;font-family:"serif";}
#yiv803265409 a:link, #yiv803265409 span.yiv803265409MsoHyperlink
        {color:blue;text-decoration:underline;}
#yiv803265409 a:visited, #yiv803265409 span.yiv803265409MsoHyperlinkFollowed
        {color:purple;text-decoration:underline;}
#yiv803265409 span.yiv803265409EmailStyle17
        {font-family:"sans-serif";color:windowtext;font-weight:normal;font-style:normal;text-decoration:none none;}
#yiv803265409 .yiv803265409MsoChpDefault
        {}
 _filtered #yiv803265409 {margin:1.0in 1.0in 1.0in 1.0in;}
#yiv803265409 div.yiv803265409WordSection1
        {}
--></style><div class="yiv803265409WordSection1"><p class="yiv803265409MsoNormal"><span style="font-size:14.0pt;font-family:"sans-serif";">The Air is DC, wouldn’t it just feed the battery bank and  there for less from the PV to the battery bank and therefore more PV to go to the grid tie………</span></p><p class="yiv803265409MsoNormal"><span style="font-size:14.0pt;font-family:"sans-serif";">  </span></p><p class="yiv803265409MsoNormal"><span style="font-size:14.0pt;font-family:"sans-serif";">It is a mighty small unit to go to the effort to grid tie unless he has a 18MPH+ yearly wind speed. If he has that much wind go for a SWWP - Skystream wind turbine that is UL listed for grid tie.</span></p><p class="yiv803265409MsoNormal"><span style="font-size:14.0pt;font-family:"sans-serif";">  </span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">Dana
 Orzel</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">Great Solar Works, Inc</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">E - dana@solarwork.com</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">V - 970.626.5253</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">F - 970.626.4140</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">C - 970.209.4076</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">web - www.solarwork.com</span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">  </span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">"Responsible Technologies for Responsible People since 1988"</span><span
 style="font-size:11.0pt;font-family:"sans-serif";"></span></p><p class="yiv803265409MsoNormal"><span style="font-family:"sans-serif";">Do not ever believe anything, but seriously trust through action.</span></p><p class="yiv803265409MsoNormal"><span style="font-size:14.0pt;font-family:"sans-serif";">  </span></p><div style="border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in;"><p class="yiv803265409MsoNormal" style="margin-left:.5in;"><b><span style="font-size:10.0pt;font-family:"sans-serif";">From:</span></b><span style="font-size:10.0pt;font-family:"sans-serif";"> re-wrenches-bounces@lists.re-wrenches.org [mailto:re-wrenches-bounces@lists.re-wrenches.org] <b>On Behalf Of </b>Peter Talmage<br><b>Sent:</b> Thursday, May 05, 2011 11:26 AM<br><b>To:</b> RE-wrenches<br><b>Subject:</b> [RE-wrenches] Interfacing an Air 403 wind generator</span></p></div><p class="yiv803265409MsoNormal"
 style="margin-left:.5in;">  </p><table class="yiv803265409MsoNormalTable" style="width:6.5in;margin-left:.5in;" border="0" cellpadding="0" cellspacing="0" width="780"><tbody><tr><td style="padding:0in 0in 0in 0in;" valign="top"><p class="yiv803265409MsoNormal">I have a client with an independent power system who is going utility interfaced. We are putting the 24 volt arrays on Ephase inverters. He wants the Air 403 to be interfaced as well. Has anyone done this and if so, how ?  Thanks<br><br>Peter Talmage, P.E.<br><br>Energy and Design</p></td></tr></tbody></table><p class="yiv803265409MsoNormal" style="margin-left:.5in;"><span style="font-size:10.0pt;font-family:"sans-serif";">  </span></p></div></div><br>-----Inline Attachment Follows-----<br><br><div class="plainMail">_______________________________________________<br>List sponsored by Home Power magazine<br><br>List Address: <a
 ymailto="mailto:RE-wrenches@lists.re-wrenches.org" href="/mc/compose?to=RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br><br>Options & settings:<br><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br><br>List-Archive: <a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br><br>List rules & etiquette:<br>www.re-wrenches.org/etiquette.htm<br><br>Check out participant bios:<br>www.members.re-wrenches.org<br><br></div></blockquote></td></tr></table>