<html><head></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; ">Hi Mike,<div><br></div><div>You were not able to buy just the breaker, you had to buy the whole load center or just the breaker/buss?</div><div>thanks,</div><div><br></div><div><br></div><div>jay</div><div><br></div><div>peltz power<br><div><div>On Apr 3, 2011, at 10:07 AM, Mike Nelson wrote:</div><br class="Apple-interchange-newline"><blockquote type="cite"><div>I have done this. I purchased a 225A all in one meter panel, and purchased an identical 200A meter panel, and changed out the 225A main for a 200. Now I have a useless 225A main breaker in my shop. But it worked well.</div>

<div>Mike Nelson</div>
<div>MD Electric & Solar, Inc.</div>
<div>Gualala Ca.<br><br></div>
<div class="gmail_quote">On Sun, Apr 3, 2011 at 10:04 AM, jay peltz <span dir="ltr"><<a href="mailto:jay@asis.com">jay@asis.com</a>></span> wrote:<br>
<blockquote style="border-left-color: rgb(204, 204, 204); border-left-width: 1px; border-left-style: solid; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 0.8ex; padding-left: 1ex; position: static; z-index: auto; " class="gmail_quote">I'm wondering if anyone has been able to configure a CH meter breaker ( their name for a<br>main service with meter and breakers) with a 200 amp main and 225 amp buss.<br>
<br>They make a 225 amp buss, but comes with a 225 amp main.<br><br>Reason is to allow a 10kW system without a tap, and since its a remodel<br>good time for a upgrade from the Zinsco.<br><br>thanks,<br><br>jay<br><br>peltz power<br>
<br><br></blockquote></div></blockquote></div><br></div></body></html>