<FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>This is diagram is based on a 3-phase 208 V service, as clarified in the text accompanying the diagrams. There is a mistake of sorts, however. The authors’ original manuscript called out a “generic” 7500W inverter connected to 50A, 2-P breaker. We then added more detail, calling out a Fronius 7500W IG Plus inverter. However, according to the most recent product data from the manufacturer, the max AC OCPD rating for this inverter is 45A, not 50A. The example still works w/ 45A breakers: 400A + 90A = 490A, which is larger than the 480A allowed under the 120% rule. Apply the subpanel & that problem is eliminated.<BR>
<BR>
RE: the question about which breaker to count. Code experts like Bill Brooks & John Wiles have clarified that when a dedicated inverter aggregation panel is used, the breaker on the output of the panel can be considered “the output of the utility interactive inverter(s).” The intent of the language in 690.64(B)(2) in NEC 2008 about series connected panels is not to make you count all of the breakers in a dedicated inverter aggregation panel. Rather it is to clarify that it is unnecessary use the progressively larger upstream breakers ratings, which can be “fed” by the inverters, in your point of connection calculations. <BR>
<BR>
RE: the original question. I think the most correct answer is “It depends.” It depends on your jurisdiction and your PE. A literal interpretation of the Code would appear to have you upsize the inverter aggregation panel and the feeder conductor. But there is certainly precedent for AHJs not requiring this. If you propose labeling the inverter aggregation panel “PV Only — Do Not Add Loads” and mark the feeder conductor with warnings “PV Only — Do Not Tap” wherever it is exposed, you may find that the AHJ will not require you to upsize these. <BR>
<BR>
Hope that’s cleared than mud, <BR>
<BR>
David Brearley, Senior Technical Editor<BR>
<I>SolarPro</I> magazine <BR>
NABCEP Certified PV Installer ™<BR>
<a href="david.brearley@solarprofessional.com">david.brearley@solarprofessional.com</a><BR>
Direct: 541.261.6545<BR>
<BR>
<BR>
On 3/30/11 11:12 AM, "Kent Osterberg" <<a href="kent@coveoregon.com">kent@coveoregon.com</a>> wrote:<BR>
<BR>
</SPAN></FONT><BLOCKQUOTE><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>Jason,<BR>
<BR>
Now you are opening up a can of worms. <BR>
<BR>
It's bad enough that 705.12(D) doesn't say anything about a panel that can't (or shouldn't, or won't) have anything connected but interactive inverters. But when that is the case, a bus rating of 100% of the source circuits should apply. For PV systems a 125% factor will already apply to each inverter circuit.<BR>
<BR>
While it seems logical that the conductors are an extension of the bus bar and should be treated the same way, 705.12(D) isn't about the conductors - it's about the bus bars. The conductors are protected by the breakers -- 80-amp breakers and wire with 80-amp ampacity.  <BR>
<BR>
Getting into the example further, I see flaws in it. If the inverters are 7500-watt 240-volt, the output current would be 7500/240 = 31.25 amps and 40-amp breakers would be adequate. Then there would have been no issues, even going directly into the main panel. If the inverters are 7500-watt 208-volt, the output current is 7500/208 = 36 amps and the 50-amp breakers make sense. That means the bus bars and feeder conductor have a continuous current of 72 amps.  That means neither the 80-amp breaker nor 80-amp wire is sufficient because 72 x 1.25 = 90 amps. Now the example doesn't resolve the limitation of backfeeding at the main. Opps!<BR>
<BR>
Kent Osterberg<BR>
Blue Mountain Solar<BR>
<BR>
<BR>
<BR>
<BR>
<BR>
<BR>
Jason Szumlanski wrote: <BR>
</SPAN></FONT><BLOCKQUOTE><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>    <BR>
 <BR>
<BR>
Another key is to remember that this discussion also applies to the conductor between the main panel and subpanel. In a large PV system, this could result in a pretty large wire between the two panels, and a significant cost that is often overlooked. In some cases it makes sense to locate the subpanel close to the main panel and run multiple sets of smaller wires from the inverters to the subpanel.<BR>
 <BR>
 <BR>
 <BR>
And because the calculation is based on the first OC protection connected to the inverters, adding a main breaker (theoretically 80A in this example) in the subpanel doesn’t change things. Even though this wire would be theoretically protected by an 80A breaker at each end, you can’t size the wire for 160A / 1.2 = 133.3A. You have to size for 180A/1.2 = 150A. (not that it makes much of a difference in this example, but it still must be considered)<BR>
 <BR>
 <BR>
 <BR>
At least that’s how I understand it…<BR>
 <BR>
 <BR>
 <BR>
 <BR>
<BR>
</SPAN><SPAN STYLE='font-size:12pt'>Jason Szumlanski<BR>
</SPAN><SPAN STYLE='font-size:11pt'> <BR>
Fafco Solar</SPAN><FONT SIZE="1"><SPAN STYLE='font-size:4pt'> <BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
 <BR>
 <BR>
 <BR>
 <BR>
 <BR>
 <BR>
<BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'><B>From:</B> <a href="re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a> [<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org">mailto:re-wrenches-bounces@lists.re-wrenches.org</a>] <B>On Behalf Of </B>Mark Frye<BR>
 <B>Sent:</B> Wednesday, March 30, 2011 1:33 AM<BR>
 <B>To:</B> 'RE-wrenches'<BR>
 <B>Subject:</B> Re: [RE-wrenches] sizing a sub-panel used to combinemultipleinverter outputs<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
 <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'>Opps!<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'>My bad, I was thinking of a single phase system, not the three phase system shown in the article.<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'>For the three phase system Kent is correct in counting 180A of supply per bar.<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'>Mark Frye</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>Berkeley Solar Electric Systems</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>303 Redbud Way</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>Nevada City,  CA 95959</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>(530) 401-8024</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>www.berkeleysolar.com</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <<a href="http://www.berkeleysolar.com/">http://www.berkeleysolar.com/</a>> </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'> </SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
<BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> 
</SPAN></FONT>
<P ALIGN=CENTER>
<FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
<HR ALIGN=CENTER SIZE="2" WIDTH="100%"></SPAN></FONT>
<P>
<FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
<BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'><B>From:</B> <a href="re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a> [<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org">mailto:re-wrenches-bounces@lists.re-wrenches.org</a>] <B>On Behalf Of </B>Mark Frye<BR>
 <B>Sent:</B> Tuesday, March 29, 2011 10:17 PM<BR>
 <B>To:</B> 'RE-wrenches'<BR>
 <B>Subject:</B> Re: [RE-wrenches] sizing a sub-panel used to combine multipleinverter outputs<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'>I think Kent and I agree. For the case where the subpanel is not dedicated a PV sub-panel he is calculating for 2 - 50A breakers and I calculated for 3 - 50A breakers.<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'><BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>Mark Frye</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>Berkeley Solar Electric Systems</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>303 Redbud Way</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>Nevada City,  CA 95959</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>(530) 401-8024</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
 </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'>www.berkeleysolar.com</SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <<a href="http://www.berkeleysolar.com/">http://www.berkeleysolar.com/</a>> </SPAN></FONT><FONT SIZE="2"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:10pt'> </SPAN></FONT></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
<BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> 
</SPAN></FONT>
<P ALIGN=CENTER>
<FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'> <BR>
<HR ALIGN=CENTER SIZE="2" WIDTH="100%"></SPAN></FONT>
<P>
<FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
<BR>
</SPAN><FONT SIZE="2"><SPAN STYLE='font-size:10pt'><B>From:</B> <a href="re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a> [<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org">mailto:re-wrenches-bounces@lists.re-wrenches.org</a>] <B>On Behalf Of </B>Kent Osterberg<BR>
 <B>Sent:</B> Tuesday, March 29, 2011 9:26 PM<BR>
 <B>To:</B> RE-wrenches<BR>
 <B>Subject:</B> Re: [RE-wrenches] sizing a sub-panel used to combine multiple inverter outputs<BR>
</SPAN></FONT><SPAN STYLE='font-size:11pt'> <BR>
</SPAN></FONT><FONT FACE="Times New Roman"><SPAN STYLE='font-size:12pt'>Per 705.12(D) the sub-panel could be any distribution equipment on the premises. So the question becomes: is the sub-panel capable of supplying branch circuits or feeder loads? If yes, then the sum of the breakers (potentially) feeding the bus is 180 amps so a 150-amp rating is required and the inverters would have to feed the opposite end of the bus bars. If no, the code is not clear on the requirement, but obviously the 80-amp breaker in the main panel limits the maximum current flowing through the sub-panel. <BR>
 <BR>
Kent Osterberg<BR>
Blue Mountain Solar<BR>
 <BR>
 <BR>
</SPAN></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'> <BR>
 <BR>
<BR>
<HR ALIGN=CENTER SIZE="4" WIDTH="90%"><BR>
_______________________________________________<BR>
List sponsored by Home Power magazine<BR>
<BR>
List Address: <a href="RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><BR>
<BR>
Options & settings:<BR>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><BR>
<BR>
List-Archive: <a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><BR>
<BR>
List rules & etiquette:<BR>
www.re-wrenches.org/etiquette.htm <<a href="http://www.re-wrenches.org/etiquette.htm">http://www.re-wrenches.org/etiquette.htm</a>> <BR>
<BR>
Check out participant bios:<BR>
www.members.re-wrenches.org <<a href="http://www.members.re-wrenches.org">http://www.members.re-wrenches.org</a>> <BR>
<BR>
  <BR>
</SPAN></FONT></BLOCKQUOTE><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'><BR>
<HR ALIGN=CENTER SIZE="3" WIDTH="95%"></SPAN></FONT><FONT SIZE="2"><FONT FACE="Consolas, Courier New, Courier"><SPAN STYLE='font-size:10pt'>_______________________________________________<BR>
List sponsored by Home Power magazine<BR>
<BR>
List Address: <a href="RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><BR>
<BR>
Options & settings:<BR>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><BR>
<BR>
List-Archive: <a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><BR>
<BR>
List rules & etiquette:<BR>
www.re-wrenches.org/etiquette.htm<BR>
<BR>
Check out participant bios:<BR>
www.members.re-wrenches.org<BR>
<BR>
</SPAN></FONT></FONT></BLOCKQUOTE><FONT SIZE="2"><FONT FACE="Consolas, Courier New, Courier"><SPAN STYLE='font-size:10pt'><BR>
</SPAN></FONT></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'><BR>
Fax:  541.512.0343<BR>
<B><BR>
</B>Visit our Web site at solarprofessional.com<BR>
<BR>
(Sample copy available for download at: solarprofessional.com/sample)<BR>
<BR>
<BR>
</SPAN></FONT>
</BODY>
</HTML>