<table cellspacing="0" cellpadding="0" border="0" ><tr><td valign="top" style="font: inherit;"><div class="msgheader"><div class="subjectbar"><div>
                <div id="message_view_date" class="date"><nobr><br><br><br><br><span style="color: rgb(0, 0, 0);">hello Karl,<br>  I face a similar situation in my town (utility is a muny(sp.?)).I'm not certain about this but I believe this to be a violation of<br>PURPA. There is some info on PURPA on Wikipedia (for what it's worth) and Union of Concerned Scientists, or a Web search. <br>I believe you can effectively argue the point of interconnection and net metering, but the point of "avoided costs" is sticker. My<br>town wants to offer zero compensation for my kWhs. For me, that's a problem but not a huge deal. The real problem is that it <br>sets a PRECEDENT for those who choose to do the same. I can see that I'm in for a battle with these guys. <br>  Also, I would like to thank those who responded to my "water pumping" post. Looks like we will use an inverter.<br>  Also, an addendum to "module cleaning". A good way to clean cables is to put
 them in the washing machine. I do<br>this with some rags or work clothes and them come out like brand new.<br><br><br></span>Tuesday, February 15, 2011 4:21 PM</nobr></div>
                </div></div>
            <div class="vcard">
            <div class="row">
            <div class="label">From: </div>
            <div class="details"><div class="abook"><span class="email">"Karl Jaeger" <kjaeger@lightwavesolar.com></span></div>
                </div>
                
                </div><div class="row">
                <div class="label">To: </div>
                <div class="details">"re-wrenches@lists.re-wrenches.org" <re-wrenches@lists.re-wrenches.org></div></div></div></div><div style="overflow: visible; visibility: visible;" id="yiv1596346438"><style>#yiv1596346438 _filtered #yiv1596346438 { font-family: Calibri; }#yiv1596346438 #yiv1596346438 p.yiv1596346438MsoNormal, #yiv1596346438 li.yiv1596346438MsoNormal, #yiv1596346438 div.yiv1596346438MsoNormal { margin: 0in 0in 0.0001pt; font-size: 11pt; font-family: "sans-serif"; }#yiv1596346438 a:link, #yiv1596346438 span.yiv1596346438MsoHyperlink { color: blue; text-decoration: underline; }#yiv1596346438 a:visited, #yiv1596346438 span.yiv1596346438MsoHyperlinkFollowed { color: purple; text-decoration: underline; }#yiv1596346438 span.yiv1596346438EmailStyle17 { font-family: "sans-serif"; color: windowtext; }#yiv1596346438 .yiv1596346438MsoChpDefault { font-family: "sans-serif"; }_filtered #yiv1596346438 { margin: 1in; }#yiv1596346438
 div.yiv1596346438WordSection1 {  }</style><div class="yiv1596346438WordSection1"><p class="yiv1596346438MsoNormal">Greetings Esteemed Wrenches,</p><p class="yiv1596346438MsoNormal">  </p><p class="yiv1596346438MsoNormal">My
 company was recently tasked to engineer a PV project in Alabama. We sat
 down for a meeting with all of the local big-shots. They proceeded to 
let us know that we are not allowed to feed any excess PV power onto 
their grid, production cannot exceed demand. I am hoping that y’all 
might be able to steer me towards a contactor assembly or device that 
would detect reverse current flow, trigger the contactor, then open up 
the inverter AC output circuit. The service is 3-phase, 208 volt. The 
maximum current we intend to introduce is 70 amps, continuous.</p><p class="yiv1596346438MsoNormal">  </p><p class="yiv1596346438MsoNormal">Appreciate your advice,</p><p class="yiv1596346438MsoNormal">  </p><p class="yiv1596346438MsoNormal">Karl Jaeger</p><p class="yiv1596346438MsoNormal">Operations Manager</p><p class="yiv1596346438MsoNormal">LightWave Solar Electric</p><p class="yiv1596346438MsoNormal">www.lightwavesolar.com</p></div></div><br><br>Tom DeBates<br>
Habi-Tek<br>
524 Summit St.<br>
Geneva,IL. 60134<br>
    630-262-8193<br>
fax 630-262-1343</td></tr></table><br>