<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:arial,helvetica,sans-serif;font-size:12pt">My list is over 100 inverters so far, and I have only got 2-3 years of jobs processed.  Getting together all the serial numbers is taking some time.  I am glad this recall didn't happen during the end-of-year rush.<br><div> </div>Nick Soleil<br>Project Manager<br>Advanced Alternative Energy Solutions, LLC<br>PO Box 657<br>Petaluma, CA 94953<br>Cell:   707-321-2937<br>Office: 707-789-9537<br>Fax:    707-769-9037<div><br></div><div style="font-family: arial,helvetica,sans-serif; font-size: 12pt;"><br><div style="font-family: arial,helvetica,sans-serif; font-size: 10pt;"><font face="Tahoma" size="2"><hr size="1"><b><span style="font-weight: bold;">From:</span></b> Peter Parrish <peter.parrish@calsolareng.com><br><b><span style="font-weight: bold;">To:</span></b> glenn.burt@glbcc.com;
 RE-wrenches <re-wrenches@lists.re-wrenches.org><br><b><span style="font-weight: bold;">Sent:</span></b> Tue, January 25, 2011 10:43:00 AM<br><b><span style="font-weight: bold;">Subject:</span></b> Re: [RE-wrenches] Schneider recall<br></font><br>
I believe that Schneider will send PB board swap-out kits to installers and<br>compensate installers for the swap-out. We are putting together a list of<br>all the GT inverters that we have installed since 2002 and will ask for<br>enough to cover the list, and if we have extra kts left over, we will be<br>able to send them back to Schneider.<br><br>I understand that almost every GT inverter is subject to this recall.  It<br>looks like we may have 30 or so to take care of.<br><br>- Peter<br> <br>Peter T. Parrish, Ph.D., President<br>California Solar Engineering, Inc.<br>820 Cynthia Ave., Los Angeles, CA 90065<br>CA Lic. 854779, NABCEP Cert. 031806-26<br><a ymailto="mailto:peter.parrish@calsolareng.com" href="mailto:peter.parrish@calsolareng.com">peter.parrish@calsolareng.com</a>  <br>Ph 323-258-8883, Mobile 323-839-6108, Fax 323-258-8885<br><br> <br>________________________________________<br>From: <a
 ymailto="mailto:re-wrenches-bounces@lists.re-wrenches.org" href="mailto:re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a><br>[mailto:<a ymailto="mailto:re-wrenches-bounces@lists.re-wrenches.org" href="mailto:re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a>] On Behalf Of Glenn Burt<br>Sent: Tuesday, January 25, 2011 9:14 AM<br>To: 'RE-wrenches'<br>Subject: [RE-wrenches] Schneider recall<br><br>So have you seen the widespread recall on the Xantrex GT and Sunpower SPRx<br>line?<br>Bulletin reports instances of the wiring cover blowing off the inverter &<br>suggests all inverters be shut down until a retrofit kit is available for<br>installation.<br><br>-Glenn Burt<br><br><br>_______________________________________________<br>List sponsored by Home Power magazine<br><br>List Address: <a ymailto="mailto:RE-wrenches@lists.re-wrenches.org"
 href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br><br>Options & settings:<br><span><a target="_blank" href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a></span><br><br><span>List-Archive: <a target="_blank" href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a></span><br><br>List rules & etiquette:<br><a target="_blank" href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a><br><br>Check out participant bios:<br><a target="_blank" href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a><br><br></div></div>
</div><br>

      </body></html>