<FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>Actually, the article “Can We Land” by Ryan LeBlanc and Tarn Yates probably has the best discussion of 690.64(B)(2) issues in particular:<BR>
<BR>
<a href="http://solarprofessional.com/article/?file=SP2_4_pg24_LeBlanc&search=">http://solarprofessional.com/article/?file=SP2_4_pg24_LeBlanc&search=</a><BR>
<BR>
Diagrams 2a & bm for example, should compliment the calculations in the Hamon article.<BR>
<BR>
DC<BR>
<BR>
On 12/7/10 4:51 AM, "Al Frishman" <<a href="amfrish@aeonsolar.com">amfrish@aeonsolar.com</a>> wrote:<BR>
<BR>
</SPAN></FONT><BLOCKQUOTE><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'><FONT COLOR="#1F497D">Wrenches,<BR>
How do you apply NEC 690.64 (B) (2) when you have multiple single phase <BR>
inverters distributed across the 3 phases of an electric-panel via 2 pole breakers? <BR>
 <BR>
Do you simply add up the total of all over-current devices feeding the <BR>
panel (Inverter 2-pole breakers and main breaker) or is there a 3 phase <BR>
formula that gets applied?<BR>
 <BR>
It seems logical that if the single phase inverters are connected with 2-pole breakers<BR>
Distributed across the 3 phases then you would take the sum of what is on each phase.<BR>
 <BR>
Any and all input on this topic is appreciated.<BR>
 <BR>
Regards,<BR>
Al<BR>
</FONT>Aeonsolar<BR>
917 699 6641<BR>
 <BR>
 <BR>
<BR>
<HR ALIGN=CENTER SIZE="3" WIDTH="95%"></SPAN></FONT><FONT SIZE="2"><FONT FACE="Consolas, Courier New, Courier"><SPAN STYLE='font-size:10pt'>_______________________________________________<BR>
List sponsored by Home Power magazine<BR>
<BR>
List Address: <a href="RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><BR>
<BR>
Options & settings:<BR>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><BR>
<BR>
List-Archive: <a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><BR>
<BR>
List rules & etiquette:<BR>
www.re-wrenches.org/etiquette.htm<BR>
<BR>
Check out participant bios:<BR>
www.members.re-wrenches.org<BR>
<BR>
</SPAN></FONT></FONT></BLOCKQUOTE><FONT SIZE="2"><FONT FACE="Consolas, Courier New, Courier"><SPAN STYLE='font-size:10pt'><BR>
</SPAN></FONT></FONT><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>David Brearley, Senior Technical Editor<BR>
<I>SolarPro</I> magazine <BR>
NABCEP Certified PV Installer ™<BR>
<a href="david.brearley@solarprofessional.com">david.brearley@solarprofessional.com</a><BR>
Direct: 541.261.6545<BR>
Fax:  541.512.0343<BR>
<B><BR>
</B>Visit our Web site at solarprofessional.com<BR>
<BR>
(Sample copy available for download at: solarprofessional.com/sample)<BR>
<BR>
<BR>
</SPAN></FONT>
</BODY>
</HTML>