<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD><TITLE>Message</TITLE>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.6000.17080" name=GENERATOR></HEAD>
<BODY 
style="WORD-WRAP: break-word; webkit-nbsp-mode: space; webkit-line-break: after-white-space">
<DIV dir=ltr align=left><SPAN class=883053222-20102010><FONT face=Arial 
color=#0000ff size=2>Kris has a good idea. Installing 2x backer blocks on 
the I-joists will not only give you more depth for your lag screws, 
but it will strengthen the roof framing as well. Also, as Kris recommends, 
check with the manufacturer for nailing patterns, etc. I was dealing with some 
BCI joists this past summer and I was pleased that Boise Cascade has structural 
engineers on staff that are eager to help, and can email you approved drawings 
for reinforcing the joists.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=883053222-20102010><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=883053222-20102010><FONT face=Arial 
color=#0000ff size=2>-Hans</FONT></SPAN></DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> re-wrenches-bounces@lists.re-wrenches.org 
[mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of 
</B>Kristopher Schmid<BR><B>Sent:</B> Wednesday, October 20, 2010 1:33 
PM<BR><B>To:</B> 'RE-wrenches'<BR><B>Subject:</B> Re: [RE-wrenches] The perfect 
solar ready roof<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV><SPAN class=449202920-20102010><FONT face=Arial color=#0000ff size=2>What 
about screwing in double 2x6s flush to the roof deck between the beams where 
your feet will attach and lag bolting into that?  Definitely check with the 
beam manufacturer first, though.</FONT></SPAN></DIV>
<DIV><SPAN class=449202920-20102010><FONT face=Arial color=#0000ff 
size=2></FONT></SPAN> </DIV>
<DIV><SPAN class=449202920-20102010><FONT face=Arial color=#0000ff 
size=2>Kris</FONT></SPAN></DIV><!-- Converted from text/plain format -->
<P><FONT size=2>Legacy Solar<BR>864 Clam Falls Trail<BR>Frederic, WI 
54837<BR>715-653-4295<BR>solman@legacysolar.com<BR>www.legacysolar.com 
</FONT></P>
<BLOCKQUOTE dir=ltr style="MARGIN-RIGHT: 0px">
  <DIV></DIV>
  <DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left><FONT 
  face=Tahoma size=2>-----Original Message-----<BR><B>From:</B> 
  re-wrenches-bounces@lists.re-wrenches.org 
  [mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of </B>Scott 
  McCalmont<BR><B>Sent:</B> Wednesday, October 20, 2010 12:00 AM<BR><B>To:</B> 
  RE-wrenches<BR><B>Subject:</B> Re: [RE-wrenches] The perfect solar ready 
  roof<BR><BR></FONT></DIV>In general, you shouldn't drill or cut the flanges on 
  engineered wood beams. I think that eliminates lag screws into the rafters. 
  They probably wouldn't have the same pull-out strength as a lag screw into a 
  conventional rafter, either. 
  <DIV><BR></DIV>
  <DIV>Scott<BR>
  <DIV><BR>
  <DIV>
  <DIV>On Oct 19, 2010, at 7:58 PM, Chris Daum wrote:</DIV><BR 
  class=Apple-interchange-newline>
  <BLOCKQUOTE type="cite"><SPAN class=Apple-style-span 
    style="WORD-SPACING: 0px; FONT: medium Helvetica; TEXT-TRANSFORM: none; TEXT-INDENT: 0px; WHITE-SPACE: normal; LETTER-SPACING: normal; BORDER-COLLAPSE: separate; orphans: 2; widows: 2; webkit-border-horizontal-spacing: 0px; webkit-border-vertical-spacing: 0px; webkit-text-decorations-in-effect: none; webkit-text-size-adjust: auto; webkit-text-stroke-width: 0px">
    <DIV lang=EN-US vlink="purple" link="blue">
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010>Dear Wrenches:</SPAN></FONT></O:P></DIV>
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010></SPAN></FONT></O:P></DIV>
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010>I have a composite (shingle) roof at hand, and the 
    owner wants to upgrade it to a metal roof and install a 5kw+ array on 
    it.   The rafters are those (sort of) particle board I-beams 
    covered with 1/2" plywood (and shingles).  What's the best metal 
    roofing you could suggest--and would you beef up the wood to lag 
    into?</SPAN></FONT></O:P></DIV>
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010></SPAN></FONT></O:P></DIV>
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010>Thanks for all your 
input.</SPAN></FONT></O:P></DIV>
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010></SPAN></FONT></O:P></DIV>
    <DIV dir=ltr align=left><O:P><FONT face="Comic Sans MS" color=#800000><SPAN 
    class=177075402-20102010>
    <DIV align=left>
    <DIV align=left><FONT face="Comic Sans MS" color=#000080 size=2>Chris 
    Daum</FONT></DIV>
    <DIV align=left><FONT face="Comic Sans MS" color=#000080 size=2>Oasis 
    Montana Inc.</FONT></DIV>
    <DIV align=left><FONT face="Comic Sans MS" color=#000080 
    size=2>406-777-4309</FONT></DIV>
    <DIV align=left><FONT face="Comic Sans MS" color=#000080 size=2>406-777-0830 
    fax</FONT><FONT face="Comic Sans MS" color=#000080 size=3><SPAN 
    class=046344020-29052008></SPAN></FONT></DIV></DIV></SPAN></FONT></O:P></DIV>_______________________________________________<BR>List 
    sponsored by Home Power magazine<BR><BR>List Address:<SPAN 
    class=Apple-converted-space> </SPAN><A 
    style="COLOR: blue; TEXT-DECORATION: underline" 
    href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</A><BR><BR>Options 
    & settings:<BR><A style="COLOR: blue; TEXT-DECORATION: underline" 
    href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</A><BR><BR>List-Archive:<SPAN 
    class=Apple-converted-space> </SPAN><A 
    style="COLOR: blue; TEXT-DECORATION: underline" 
    href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</A><BR><BR>List 
    rules & etiquette:<BR><A style="COLOR: blue; TEXT-DECORATION: underline" 
    href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</A><BR><BR>Check 
    out participant bios:<BR><A style="COLOR: blue; TEXT-DECORATION: underline" 
    href="http://www.members.re-wrenches.org/">www.members.re-wrenches.org</A><BR><BR></DIV></SPAN></BLOCKQUOTE></DIV><BR></DIV></DIV></BLOCKQUOTE></BODY></HTML>