<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=windows-1252">
<STYLE><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 10pt;
font-family:Tahoma
}
--></STYLE>

<META content="MSHTML 6.00.2900.6036" name=GENERATOR></HEAD>
<BODY class=hmmessage>
<DIV><SPAN class=937382823-20102010><FONT face=Arial 
size=3>Benn</FONT></SPAN></DIV>
<DIV><SPAN class=937382823-20102010><FONT face=Arial size=3>just bear in mind 
that any adjustment of the module height, must be performed by 
turning a jam nut under the S5-PV clamps mounting surface and 
will need to be done from below using an open-end wrench! If the ribs are pretty 
level that may not be such a chore. But I've seen some pretty unlevel 
metal ribs on older roofs. </FONT></SPAN></DIV>
<DIV><SPAN class=937382823-20102010><FONT face=Arial size=3>Carry along a 10-12 
foot rail section for a straightedge to get the heights on the money before you 
start to clamp modules. </FONT></SPAN></DIV>
<DIV><SPAN class=937382823-20102010><FONT face=Arial 
size=3></FONT></SPAN> </DIV>
<DIV><SPAN class=937382823-20102010><FONT face=Arial size=3>Jim 
Duncan</FONT></SPAN></DIV>
<DIV><SPAN class=937382823-20102010><FONT face=Arial size=3>North Texas 
Renewable Energy</FONT></SPAN></DIV>
<BLOCKQUOTE dir=ltr style="MARGIN-RIGHT: 0px">
  <DIV class=OutlookMessageHeader dir=ltr align=left><FONT face=Tahoma 
  size=2>-----Original Message-----<BR><B>From:</B> 
  re-wrenches-bounces@lists.re-wrenches.org 
  [mailto:re-wrenches-bounces@lists.re-wrenches.org]<B>On Behalf Of </B>benn 
  kilburn<BR><B>Sent:</B> Wednesday, October 20, 2010 5:18 PM<BR><B>To:</B> 
  Wrenches<BR><B>Subject:</B> Re: [RE-wrenches] Mounting Enphase when using 
  S-5-PV Clamps<BR><BR></FONT></DIV>Not a lot of you guys in the field today 
  'eh?  I was just checking a spec on my laptop and noticed i had a 
  wireless signal and a mailbox full of great feedback, thanks again 
  everyone!!! 
  <DIV><BR></DIV>
  <DIV> I'll go over all the details from everyone a little more when i'm 
  done on site for the day.  For a few of you i just wanted to show you 
  this link to the S-5-PV clamp, which is different from just the S-5! clamp 
   > <A href="http://www.S-5.com/clamps/index_686.cfm">Click here 
  to learn more.</A> <  The S-5-PV does not need rails, the mod 
  frames sit on the 'mounting disc' which can accommodate one or two modules. 
   BUT, with the Enphase system, this leave no where to mount the 
  inverters.  Bill made a good point; save this mounting method for string 
  inverter systems.  </DIV>
  <DIV>We are now planning this project using just the S-5 clamp/L-foot/rail 
  system.  No problems. </DIV>
  <DIV><BR></DIV>
  <DIV>Back at 'er!<BR>
  <DIV>benn<BR><SPAN class=ecxecxecxecxEC_Apple-style-span 
  style="COLOR: rgb(0,32,96)"><FONT class=ecxApple-style-span 
  face="'Franklin Gothic Medium'">DayStar Renewable Energy 
  Inc. </FONT></SPAN>
  <DIV>
  <DIV><FONT class=ecxApple-style-span 
  face="'Franklin Gothic Medium'">benn@daystarsolar.ca</FONT></DIV>
  <DIV><FONT class=ecxApple-style-span 
  face="'Franklin Gothic Medium'">780-906-7807 </FONT></DIV>
  <DIV><FONT class=ecxApple-style-span face="'Franklin Gothic Medium'">HAVE A 
  SUNNY DAY </FONT></DIV>
  <DIV><BR></DIV></DIV></DIV></DIV></BLOCKQUOTE></BODY></HTML>