<font size=3>Dan:<br><br>
Your observation is absolutely the truth.  I was required to install
a disconnect when I put my system in.  Every time I see a line crew
in the neighborhood I would stop them and ask if they new there was a
grid-tie system nearby. The answer was always that their plans did not
indicate grid-tie systems.<br><br>
William Miller<br><br>
PS:  When we remodeled I replaced my service and removed the
disconnect.<br><br>
wm<br><br>
<br>
At 05:27 PM 2/13/2010, you wrote:<br>
<blockquote type=cite class=cite cite>Hello Joel --<br><br>
Well, you can be assured that both NREL and IREC are on your side. They
were very convincing about dropping UEDS requirements at this seminar.
Funny how utilities can require UEDSs, but none of them have the
procedures, personnel or infrastructure to actually *use* them.<br><br>
Imagine a 'green neighborhood' with PV on each of four dozen homes.
Figure at least 10 minutes each for the utility to locate and tag / lock
out each UEDS...and the same to re-commission them after the incident.
And how many utility trucks carry 4 dozen locks?<br><br>
I won't go into any more UEDS issues here, but I will be writing about
them soon and publish the link here on the list.<br><br>
DAN FINK<br>