<div>Hi All,</div>
<div> </div>
<div>We recently completed a 63kW grid-tie in MA.  The Fire Department has asked us to label the rooftop conduit (2 1/2" RMC) with high visibilty labels that say something to the effect of "High Voltage DC" or "600 Volts DC" or "Warning - Solar DC Circuits."  The trouble is that the Fire Department doesn't really know what they want to the label to say.  Have any of you come across this with your Fire Departments?  Any thoughts on the wording for the label, and how often they should be placed on the conduit run (every stick, every 6', every 20', etc.)?</div>


<div> </div>
<div>Thanks,</div>
<div>Mike<br clear="all">--<br>Michael Kelly<br>Project Manager / Project Engineer<br>NABCEP Certified Solar PV Installer ™<br><br>SolarFlair Energy, Inc.<br>11 Mayhew Street<br>Framingham, MA 01702<br>Direct Mobile: 617-899-9840<br>

Main Phone: 508-293-4293<br>Main Fax: 508-293-4003<br><a href="mailto:mike@solarflair.com">mike@solarflair.com</a><br></div>