<span style="font-family: Arial, Helvetica, sans-serif; font-size: 10pt">Hi Gang,<br />
<br />
I have a problem. We are installing a gridtie PV system  with 2 battery-based inverters for 240V. The service coming in to the condo is 120/208 split-phase fed from 3-phase 208 in main building. The master inverter pickups up L1 but the slave inverter will not sync. What am I missing?<br />
<br />
Thanks and Happy New Year to all!<br />
<br />
<div id="divSignature"></div></span>