<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content="text/html; charset=us-ascii" http-equiv=Content-Type>
<META name=GENERATOR content="MSHTML 8.00.6001.18854"></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=515155221-31122009><FONT color=#0000ff 
size=2 face=Arial>Not syncing or not seeing AC line voltage within range 
(240V)?</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=515155221-31122009></SPAN> <BR><SPAN 
lang=en-us><FONT size=2 face=Arial>Mark Frye</FONT></SPAN> <BR><SPAN 
lang=en-us><FONT size=2 face=Arial>Berkeley Solar Electric Systems</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT size=2 face=Arial>303 Redbud Way</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT size=2 face=Arial>Nevada City,  CA 
95959</FONT></SPAN> <BR><SPAN lang=en-us><FONT size=2 face=Arial>(530) 
401-8024</FONT></SPAN> <BR><SPAN lang=en-us></SPAN><A 
href="http://www.berkeleysolar.com/"><SPAN lang=en-us><U><FONT color=#0000ff 
size=2 face=Arial>www.berkeleysolar.com</FONT></U></SPAN></A><SPAN 
lang=en-us><FONT size=2 face=Arial> </FONT></SPAN> </DIV>
<DIV> </DIV><BR>
<DIV dir=ltr lang=en-us class=OutlookMessageHeader align=left>
<HR tabIndex=-1>
<FONT size=2 face=Tahoma><B>From:</B> re-wrenches-bounces@lists.re-wrenches.org 
[mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of </B>Nik 
Ponzio<BR><B>Sent:</B> Thursday, December 31, 2009 1:15 PM<BR><B>To:</B> 
RE-wrenches@lists.re-wrenches.org<BR><B>Subject:</B> [RE-wrenches] dual stacked 
inverters on 208V service<BR></FONT><BR></DIV>
<DIV></DIV><SPAN 
style="FONT-FAMILY: Arial, Helvetica, sans-serif; FONT-SIZE: 10pt">Hi 
Gang,<BR><BR>I have a problem. We are installing a gridtie PV system with 2 
battery-based inverters for 240V. The service coming in to the condo is 120/208 
split-phase fed from 3-phase 208 in main building. The master inverter pickups 
up L1 but the slave inverter will not sync. What am I missing?<BR><BR>Thanks and 
Happy New Year to all!<BR><BR>
<DIV id=divSignature></DIV></SPAN></BODY></HTML>