<font size=3>Dick:<br><br>
I've got no problem responding, but before I complete a quiz, I always
like to make sure I am giving the correct answer.<br><br>
We have seen this AHJ ask questions they have no right to ask, such as,
are you wiring your batteries in series, parallel or both?  There is
no requirement as to how system voltage is achieved and sometime we
change our minds mid-project, so I decline to answer these
questions.<br><br>
We have also seen them be plain wrong on many issues.  Most of the
time I know the correct interpretation and, if the correction request is
valid, I will modify my design.  If I am being asked to correct
something that is already code compliant, I will politely refuse and
provide substantiation.  Complying with unnecessary requests can be
expensive and sets a bad precedent.  I like to interact the AHJ on a
very professional level and it's all about doing one's 
homework.<br><br>
William<br><br>
<br><br>
<br>
At 06:33 PM 12/11/2009, you wrote:<br>
<blockquote type=cite class=cite cite>William,<br><br>
No, I mean what is your problem with complying with the request,
"Show the<br>
number of existing circuits and/or the  <br>
disconnecting means for panel C". Why not just do that?<br><br>
Dick<br><br>
<br><br>
--- You wrote:<br>
Dick:<br><br>
I too am mystifed.  I sent a request for clarification but have
not  <br>
heard back.  It may be some kind of power trip as we have been at
odds  <br>
over many issues.  I will report back.<br><br>
William Miller<br>
Millersolar.com<br><br>
On Dec 11, 2009, at 6:05 PM, Richard.L.Ratico@VALLEY.NET (Richard L 
<br>
Ratico) wrote:<br><br>
> William,<br>
><br>
> No direct specific experience with this, but, respectfully, what
is  <br>
> the problem?<br>
> The code sections seem clear and not unreasonable nor arduous.<br>
><br>
> Dick Ratico<br>
> Solarwind Electric<br>
><br>
><br>
> --- You wrote:<br>
> Friends:<br>
><br>
><br>
> I just received a plan correction for a grid-tie permit
application  <br>
> wherein<br>
> the inspector is questioning compliance with section 225. 
Below is  <br>
> the<br>
> text of the correction notice:<br>
><br>
> The existing panel C in the pump house must comply with NEC 225.31.
225.32<br>
> & 225.33. Show the number of existing circuits and/or the 
<br>
> disconnecting<br>
> means for panel C.<br>
><br>
> Has anyone ever had experience with this section being applied to
a<br>
> grid-tie system?  The inverters will be inside a pump house
remote  <br>
> from the<br>
> main residence.<br>
><br>
> Thanks in advance.<br>
><br>
> William Miller<br>
><br>
--- end of quote ---<br>
_______________________________________________<br>
List sponsored by Home Power magazine<br><br>
List Address: RE-wrenches@lists.re-wrenches.org<br><br>
Options & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" eudora="autourl">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br><br>
List-Archive:
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" eudora="autourl">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br><br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" eudora="autourl">www.re-wrenches.org/etiquette.htm</a><br><br>
Check out participant bios:<br>
<a href="http://www.members.re-wrenches.org/" eudora="autourl">www.members.re-wrenches.org</a><br><br>
No virus found in this incoming message.<br>
Checked by AVG -
<a href="http://www.avg.com/" eudora="autourl">www.avg.com</a> <br>
Version: 9.0.716 / Virus Database: 270.14.103/2558 - Release Date:
12/11/09 02:06:00</blockquote>
<x-sigsep><p></x-sigsep>
<u>Please note new e-mail address and domain:<br><br>
</u>William Miller <br>
Miller Solar<br>
Voice :805-438-5600<br>
email: william@millersolar.com<br>
<a href="http://millersolar.com/" eudora="autourl">http://millersolar.com<br>
</a>License No. C-10-773985<br>
</font></body>
</html>