<html><head></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; ">Hi Mark,<div><br></div><div>I'd install as much PV as I could afford, a MPPT controller and a battery capacity meter to keep an eye on things.</div><div>And if they are still looking to throw money around then a new generator as Allan suggested.</div><div><br></div><div>jay</div><div><br></div><div>peltz power</div><div><br></div><div><div><div><div><div>On Dec 3, 2009, at 9:22 AM, Mark Frye wrote:</div><br class="Apple-interchange-newline"><blockquote type="cite">
<div>
<!-- Converted from text/rtf format --><p><font size="2" face="Arial">Folks,</font>
</p><p><font size="2" face="Arial">I have a customer with a 3 year old system  in northern CA:</font>
</p><p><font size="2" face="Arial">8 - Deka 370AH, 6V, 2x4 banks - 740Ah @ 24V</font>

<br><font size="2" face="Arial">2 - DR2424 120/240V series</font>

<br><font size="2" face="Arial">4 - EC-120-GL</font>

<br><font size="2" face="Arial">1 - C40 CC</font>

<br><font size="2" face="Arial">1 - 5000W, old portable gas gen</font>
</p><p><font size="2" face="Arial">The problem is increased gen runtime probally due to chronic undercharging.</font>
</p><p><font size="2" face="Arial">Based on estimated consumption in the home, I think he needs about 2X the PV to meet the energy production needs in the summer (5 kWH/day)(30% DOD/day). But in order to get C10 charging during the summer he would need 5X the PV?</font></p><p><font size="2" face="Arial">Money is and issue. So what should I recommend:</font>
</p><p><font size="2" face="Arial">1 - Increase PV 4X to 5X, add MPPT controller to get to a PV based system with gen support</font>

<br><font size="2" face="Arial">2 - Get a 3K to 5K propane gen and and run as a gen based system with PV support</font>

<br><font size="2" face="Arial">3 -?</font>

<br><font face="Arial"> </font>

<br><font size="2" face="Arial">Mark Frye</font>

<br><font size="2" face="Arial">Berkeley Solar Electric Systems</font>

<br><font size="2" face="Arial">303 Redbud Way</font>

<br><font size="2" face="Arial">Nevada City,  CA 95959</font>

<br><font size="2" face="Arial">(530) 401-8024</font>

<br><a href="http://www.berkeleysolar.com/"><u><font color="#0000FF" size="2" face="Arial">www.berkeleysolar.com</font></u></a><font size="2" face="Arial"> </font>
</p>

</div>
_______________________________________________<br>List sponsored by Home Power magazine<br><br>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br><br>Options & settings:<br><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br><br>List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org<br><br>List rules & etiquette:<br>www.re-wrenches.org/etiquette.htm<br><br>Check out participant bios:<br>www.members.re-wrenches.org<br><br></blockquote></div><br></div></div></div></body></html>