<br><font size=2 face="sans-serif">Hi Ryan,</font>
<br>
<br><font size=2 face="sans-serif">There is no technical reason for the
delay, we have been caught with the economy recovering a bit faster than
we had expected, so have a case of demand exceeding supply. Sorry for any
inconvenience this may have caused, but we are working with our suppliers
to get caught up as soon as we can.</font>
<br>
<br><font size=2 face="sans-serif">Cheers,</font>
<br>
<br><font size=2 face="sans-serif">Mark<br>
</font><font size=3 color=#008000>_____________________________________________________________________________________</font><font size=3>
<br>
</font><font size=1 face="Arial"><b><br>
Mark Edmunds</b>  |  </font><font size=1 color=#008000 face="Arial"><b>
Schneider Electric </b></font><font size=1 face="Arial"><b>  |  Renewable
Energies Business</b>  |   <b>CANADA</b>  |   <b>Senior
Director, Engineering</b> <b><br>
Phone:</b> +1-604-422-2609  |   <b>Mobile:</b> +1-604-613-3285
<b><br>
Email:</b> </font><a href="mailto:mark.edmunds@ca.schneider-electric.com"><font size=1 color=blue face="Arial"><u>mark.edmunds@ca.schneider-electric.com</u></font></a><font size=1 face="Arial">
 |   <b>Site:</b></font><a href=http://www.xantrex.com/ target=_blank><font size=1 color=blue face="Arial"><u>
www.xantrex.com</u></font></a><font size=1 face="Arial">  |  
<b>Address:</b> 8999 Nelson Way, Burnaby, BC V5A 4B5, CANADA <br>
</font><font size=1 color=#00a000 face="Arial"><br>
*** Please consider the environment before printing this e-mail</font><font size=1 face="Arial">
</font><font size=3><br>
</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">From:</font>
<td><font size=1 face="sans-serif">ryan@solar4maine.com</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">To:</font>
<td><font size=1 face="sans-serif">re-wrenches@lists.re-wrenches.org</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Date:</font>
<td><font size=1 face="sans-serif">11/12/2009 02:04 PM</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Subject:</font>
<td><font size=1 face="sans-serif">[RE-wrenches] Xantrex XW CC availability</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Sent by:</font>
<td><font size=1 face="sans-serif">re-wrenches-bounces@lists.re-wrenches.org</font></table>
<br>
<hr noshade>
<br>
<br>
<br><tt><font size=2><br>
Is it just me or what. I have a grid tied system we are doing and I am
told mid january on the xw cc. I ended up using an outback but it puzzles
me why a 2 to 3 month wait on controllers did X find a glitch and redoing
them?<br>
Sent from my BlackBerry® wireless device from U.S. Cellular<br>
_______________________________________________<br>
</font></tt>
<br>