<font size=3>Dick:<br><br>
I do not desire to find building official who insist on a strict
interpretation of the code, but it is a reality in our
jurisdictions.  We have to be pro-active and know the code better
than they do, or we lose money when we are assessed corrective actions
that increase our costs.  Bruce is a living example of this (I think
I incorrectly called him Brian, sorry).  I hope our discussion and
Bruce's experience is a lesson for other wrenches.  This is, after
all, the purpose of this forum.<br><br>
Thanks for the kind words. It is a pleasure talking shop with
you.<br><br>
Sincerely,<br><br>
William Miller<br><br>
<br><br>
<br>
At 02:47 PM 8/2/2009, you wrote:<br>
<blockquote type=cite class=cite cite>William,<br><br>
You may well find inspectors and others who will agree with you on this.
I<br>
remain firmly unconvinced. Yes, the code may be taken literally. . . .
.and<br>
also, sometimes, be taken out of context. I believe you are doing that
here. It<br>
is impossible to use words in such an airtight manner that they cannot
be<br>
misinterpreted. The NEC is riddled with wording that often serves mostly
to<br>
"muddy the waters". <br><br>
I truly respect your desire and record of doing things safely and
professionally<br>
to the highest standards, or if you deem those standards inadequate, to
improve<br>
on them yourself.<br>
As regards our discussion here, I respectfully suggest you speak with
the<br>
electrical inspector or AHJ, before you bid, so you don't include line
items<br>
that may not be required. Then you may decide if you wish to include them
in<br>
your bid anyhow. Or not.<br><br>
Thanks for your sincere concern that things be done well. <br>
I've got to get back to work.<br><br>
Dick</font></blockquote></body>