<DIV><FONT face=Arial>Morning William,</FONT></DIV>
<DIV><FONT face=Arial></FONT> </DIV>
<DIV><FONT face=Arial>regarding 1--</FONT></DIV>
<DIV><FONT face=Arial></FONT> </DIV>
<DIV><FONT face=Arial>Don't know what your net-metering application form 
requires, but in VA the installing company has to certify/ sign off on the 
equipment meeting 1741. Years ago, after y2k, we had a Co-op so eager to show 
their support for net metering, that their people , after inspecting the system 
and testing the loss off grid transfer function by pulling the meter, signed the 
forms themselves. </FONT></DIV>
<DIV><FONT face=Arial></FONT> </DIV>
<DIV><FONT face=Arial>As for 2, from our experience with the local IOU, be 
careful when mentioning a motor-driven generator. They don't understand that the 
XW can't sell that power--directly-- to the grid. Since the cat is out of the 
bag, I think you'll need to show that the gen set only charges the battery and 
passes thru the XW to the dedicated loads.</FONT></DIV>
<DIV><FONT face=Arial></FONT> </DIV>
<DIV><FONT face=Arial>May be simpler not to mention generator?</FONT></DIV>
<DIV><FONT face=Arial></FONT> </DIV>
<DIV><FONT face=Arial>Ken</FONT></DIV>
<BLOCKQUOTE 
style="PADDING-RIGHT: 0px; PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #000000 2px solid; MARGIN-RIGHT: 0px">
  <DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
  <DIV 
  style="BACKGROUND: #e4e4e4; FONT: 10pt arial; font-color: black"><B>From:</B> 
  <A title=william@millersolar.com href="mailto:william@millersolar.com">William 
  Miller</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>To:</B> <A 
  title=re-wrenches@lists.re-wrenches.org 
  href="mailto:re-wrenches@lists.re-wrenches.org">RE-wrenches</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>Sent:</B> Thursday, March 26, 2009 2:12 
  AM</DIV>
  <DIV style="FONT: 10pt arial"><B>Subject:</B> Re: [RE-wrenches] Battery based 
  grid tie question.</DIV>
  <DIV><BR></DIV><FONT size=3>Colleagues:<BR><BR>Interesting that this topic 
  comes up at this time:<BR><BR>1. We inherited a grid-tie project wherein an 
  elderly client was sold an SW installation some years ago.  Come to find 
  out, the installer never filed anything with the utility.  The client was 
  caught recently back-feeding without permission by a meter reader and told to 
  cease and desist.  We filed an application with the utility thinking this 
  was a long shot since the client's SW inverter did not have the requisite 
  Grid-tie Interface (GTI).  We have several GTIs sitting on the shelf, but 
  the inverter does not have the proper interface so one could not be 
  installed.  Lo and behold, the utility approved this installation for 
  interconnection.<BR><BR>2. We have an application to the local utility 
  (PG&E) pending for a three XW installation with a motor-generator.  
  We have received multiple communications from PG&E doubting the 
  acceptability of the XW system for use as a gird-tied battery-back up 
  system.  We are hoping that PG&E accepts the listings from the 
  various agencies and approves the project.<BR><BR>Interesting that the old, 
  non-complaint system receives swift approval but the latest and greatest gear 
  hits a regulatory road block!  We'll keep you posted.<BR><BR>William 
  Miller<BR><BR><BR>At 04:56 PM 3/25/2009, you wrote:<BR></FONT>
  <BLOCKQUOTE class=cite cite="" type="cite"><FONT face=arial color=#0000ff 
    size=2>What year are the SWs? they have had grid inter tie for years, if the 
    inverters were manufactured prior to I think 2001 then you do not need to 
    have the gti box installed.  If the guys on a budget why spend  
    the extra $$$$? Its not the most efficient it certainly cheaper. <BR></FONT>
    <DL>
      <DD><FONT face=tahoma size=2>-----Original Message-----<BR>
      <DD>From:</B> re-wrenches-bounces@lists.re-wrenches.org [<A 
      href="mailto:re-wrenches-bounces@lists.re-wrenches.org" 
      eudora="autourl">mailto:re-wrenches-bounces@lists.re-wrenches.org</A>] On 
      Behalf Of </B>robert ellison<BR>
      <DD>Sent:</B> Wednesday, March 25, 2009 9:39 AM<BR>
      <DD>To:</B> RE-wrenches<BR>
      <DD>Subject:</B> [RE-wrenches] Battery based grid tie 
      question.<BR><BR></FONT>
      <DD><FONT size=3>On a similar question to what works well together. I am 
      rebuilding the wind side of an old off grid system that the new owner has 
      brought the grid in. He wants to grid tie the system. Another dealer is 
      doing the solar side of things.<BR>
      <DD>My thoughts are the 48 volt SW inverters need to go, and replace them 
      with Outback 48 volt grid tie units and have the wind keep the battery up. 
      Am I correct that when the batteries are full from what ever source the 
      outbacks will grid connect and net meter any excess power to the grid? 
      Seems that I remember that they will but almost never get a call for grid 
      tie up here in the sticks so I figured I would ask the knowledge base.<BR>
      <DD><BR> 
      <DD>I would suggest he keep the SW inverters to generator charge in case 
      of a long power outage as last I knew the Outbacks (FX) did not care for 
      generator power.<BR>
      <DD><BR> 
      <DD>I could probably research it but the list is faster and probably more 
      accurate that reading all the manuals with all my free time these 
days!<BR>
      <DD><BR> 
      <DD>Needless to say the fellow in on a budrgt and the power company 
      brought the power into the main building not the power house. Can't make 
      things easy......<BR>
      <DD><BR> 
      <DD>Thanks,<BR>
      <DD>Bob<BR><BR>
      <DD>2009/3/23 <<A 
      href="mailto:I2P@aol.com">I2P@aol.com</A>><BR></FONT>
      <DD><FONT face=arial size=2>Wrenches,<BR>
      <DD><BR> 
      <DD>I have been doing some experimenting --testing compatibility between 
      brands of grid tie inverters and sign wave battery type inverters. I am 
      hoping some of you also have  some experience here and we can compare 
      results.<BR>
      <DD><BR> 
      <DD>My interest is fueled by my belief that AC coupling is the ideal way 
      to increase system capacity  for battery based off grid systems. The 
      primary benefit is higher system efficiency for AC loads used during the 
      day. I realize that power management becomes important but my interest 
      right now is just to find out who talks to who. My ultimate "power 
      management" tool will be an electric vehicle. Charging it will undoubtedly 
      suck up available juice.<BR>
      <DD><BR> 
      <DD>So far:<BR>
      <DD><BR> 
      <DD>SMA synchronizes to Xantrex SW (have not tested the XW yet) and 
      Outback and of course the SMA Sunny Island<BR>
      <DD><BR> 
      <DD>Xantrex GT also syncs to the SW<BR>
      <DD><BR> 
      <DD>I started this project with Enphase as my first choice since their 
      system is so scaleable. I have been unable to make Enphase sync. Marv at 
      Enphase has been very helpful but to date no results.  I have, at 
      Marv's suggestion ,used capacitors to clean the somewhat hashy SW output 
      without results. Marv tells me he is testing Enphase and Outback. Does 
      anyone have experience syncing Enphase to other offgrid inverters?<BR>
      <DD><BR> 
      <DD>Any experiences with Fronius and others.? <BR>
      <DD><BR> 
      <DD>Though the SW output is not the cleanest, the results with SB and GT 
      are very stable. They hookup early AM and its steady green light all day 
      long. Though I use microwave, start induction motors etc, and my scope 
      clearly shows lots of spikes during these events, the GT and SB hang 
      in.<BR>
      <DD><BR> 
      <DD>What are the experiences from others regarding mix and match?. 
      Interoperability among brands seems to be a very desirable goal to this 
      wrench.<BR>
      <DD><BR> 
      <DD>Don Loweburg<BR>
      <DD>Offline Solar, Inc</FONT> </DD></DL></BLOCKQUOTE>
  <P>
  <HR>

  <P></P>_______________________________________________<BR>List sponsored by 
  Home Power magazine<BR><BR>List Address: 
  RE-wrenches@lists.re-wrenches.org<BR><BR>Options & 
  settings:<BR>http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org<BR><BR>List-Archive: 
  http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org<BR><BR>List 
  rules & etiquette:<BR>www.re-wrenches.org/etiquette.htm<BR><BR>Check out 
  participant 
bios:<BR>www.members.re-wrenches.org<BR><BR></BLOCKQUOTE></BODY></HTML>