<HTML>
<HEAD>
<TITLE>Re: [RE-wrenches] building permits for PV</TITLE>
</HEAD>
<BODY>
<FONT SIZE="4"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>We’re just about the opposite here for residential installations....<BR>
<BR>
For residential projects, off the shelf, flush mounted racking systems require no building/structural permit. Ground mount and pole mounts do require PE certification. Also flat roof racking and racks off the plane of the roof require PE certification. No building permit is required and no building inspector visits the site...the inspector for the solar rebate program, an electrical inspector, just verifies that a PE was consulted and that—as best he can tell—the structural system was installed as specified by the engineer.<BR>
<BR>
All commercial PV projects within the same jurisdiction require both electrical and building permits w/ PE certifications and plan review and inspections. These also require a fire inspection.<BR>
<BR>
<BR>
On 12/9/08 9:20 AM, "Kirpal Khalsa" <solarworks@gmail.com> wrote:<BR>
<BR>
</SPAN></FONT></FONT><BLOCKQUOTE><FONT SIZE="4"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>Hi Dana......we are also required to pull building/structural permits for our flush roof mount PV systems.....typically they require an engineer to sign off on our installation technique and also on the capability of the trusses or the rafters to handle that loads and installation technique....they don't come and inspect until the system is complete so long as they approve our plan up front.....that would be a real hassle if they made us stop between racking and panel installing for an inspection.....i can see the day where they move to that though........for pole mounted or ground mounted installs no building/structural permit has been required up until now......<BR>
cheers,<BR>
Kirpal<BR>
Renewable Energy Systems<BR>
NABCEP Certified PV Installer<BR>
<BR>
On Mon, Dec 8, 2008 at 2:45 PM, Dana Brandt <dana@ecotechenergy.com> wrote:<BR>
</SPAN></FONT></FONT><BLOCKQUOTE><FONT SIZE="4"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'>Hi all,<BR>
<BR>
Until recently, we've only been required to have an electrical permit for flush-mounted PV systems. The city has now decided to require building permits for all PV systems and wants to come out and inspect our L-feet attachments and rails before the modules can go up. This seems crazy to me. What are other jurisdictions requiring? I'd love some information I can take to the city showing that other jurisdictions aren't requiring this type of process.<BR>
<BR>
Thanks a lot,<BR>
<BR>
Dana<BR>
</SPAN></FONT></FONT></BLOCKQUOTE></BLOCKQUOTE><FONT SIZE="4"><FONT FACE="Calibri, Verdana, Helvetica, Arial"><SPAN STYLE='font-size:11pt'><BR>
David Brearley, Technical Editor<BR>
<I>SolarPro</I> magazine <BR>
NABCEP Certified PV Installer ™<BR>
david.brearley@solarprofessional.com<BR>
Direct: 541.261.6545<BR>
Fax: 541.512.0343<BR>
<B><BR>
</B>Visit our Web site at solarprofessional.com<BR>
</SPAN></FONT></FONT>
</BODY>
</HTML>