Hi all,<br><br>Until recently, we've only been required to have an electrical permit for flush-mounted PV systems. The city has now decided to require building permits for all PV systems and wants to come out and inspect our L-feet attachments and rails before the modules can go up. This seems crazy to me. What are other jurisdictions requiring? I'd love some information I can take to the city showing that other jurisdictions aren't requiring this type of process.<br>
<br>Thanks a lot,<br><br>Dana<br clear="all"><br>-- <br>Dana Brandt<br>Ecotech Energy Systems, LLC<br><a href="http://www.ecotechenergy.com">www.ecotechenergy.com</a><br><a href="mailto:dana@ecotechenergy.com">dana@ecotechenergy.com</a><br>
360.510.0433<br>