color=#0000ff size=2>120% allowance is only "..For a dwelling 
unit....".</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=328410601-06122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=328410601-06122008><FONT face=Arial 
color=#0000ff size=2>Clearly this is a load side Point of Connection. If it is a 
"dwelling unit"" then the 120% allowance is applicable. If it is not a "dwelling 
unit", then there is no room to connect under NEC 2008.</FONT></SPAN></DIV><!-- Converted from text/rtf format -->
<P><SPAN lang=en-us><FONT face=Arial></FONT></SPAN> <BR><SPAN lang=en-us><FONT 
face=Arial size=2>Mark Frye</FONT></SPAN> <BR><SPAN lang=en-us><FONT face=Arial 
size=2>Berkeley Solar Electric Systems</FONT></SPAN> <BR><SPAN lang=en-us><FONT 
face=Arial size=2>303 Redbud Way</FONT></SPAN> <BR><SPAN lang=en-us><FONT 
face=Arial size=2>Nevada City,  CA 95959</FONT></SPAN> <BR><SPAN 
lang=en-us><FONT face=Arial size=2>(530) 401-8024</FONT></SPAN> <BR><SPAN 
lang=en-us></SPAN><A href="http://www.berkeleysolar.com/"><SPAN 
lang=en-us><U><FONT face=Arial color=#0000ff 
size=2>www.berkeleysolar.com</FONT></U></SPAN></A><SPAN lang=en-us><FONT 
face=Arial size=2> </FONT></SPAN> </P>
<DIV> </DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> re-wrenches-bounces@lists.re-wrenches.org 
[mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of </B>August 
Goers<BR><B>Sent:</B> Friday, December 05, 2008 5:01 PM<BR><B>To:</B> 
RE-wrenches<BR><B>Subject:</B> Re: [RE-wrenches] load side taps and NEC 
240.21<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV style="FONT-SIZE: 10pt; FONT-FAMILY: arial, helvetica, sans-serif">Jerry -
<DIV><BR></DIV>
<DIV>A line tap typically occurs between the utility meter and the main breaker 
- not after the main breaker on the load side. It seems that you are describing 
a load side tap which follows the 120% rule under 2008 NEC; I might be 
misunderstanding the situation. Please clarify. There are few folks out there 
who are able handle these large commercial grade interconnections and I think it 
is well worth discussing.</DIV>
<DIV><BR></DIV>
<DIV>Good luck! -August </DIV>
<DIV><BR></DIV>
<DIV><BR>
<DIV></DIV>August Goers<BR><BR>
<DIV>Luminalt Energy Corporation<BR>4000 Irving Street <BR>San Francisco, CA 
94122</DIV><BR><BR>
<DIV>Office: 415.564.7652<BR>Mobile: 
415.559.1525<BR>august@luminalt.com<BR>www.luminalt.com<BR>
<DIV><BR></DIV>
<DIV style="FONT-SIZE: 10pt; FONT-FAMILY: arial, helvetica, sans-serif"><BR>
<DIV style="FONT-SIZE: 13px; FONT-FAMILY: arial, helvetica, sans-serif"><FONT 
face=Tahoma size=2>
<HR SIZE=1>
<B><SPAN style="FONT-WEIGHT: bold">From:</SPAN></B> William Miller 
<wrmiller@charter.net><BR><B><SPAN 
style="FONT-WEIGHT: bold">To:</SPAN></B> RE-wrenches 
<re-wrenches@lists.re-wrenches.org><BR><B><SPAN 
style="FONT-WEIGHT: bold">Sent:</SPAN></B> Friday, December 5, 2008 4:11:15 
PM<BR><B><SPAN style="FONT-WEIGHT: bold">Subject:</SPAN></B> Re: [RE-wrenches] 
load side taps and NEC 240.21<BR></FONT><BR>Jerry:<BR><BR>At a recent John Wiles 
seminar, John declared that this scenario is not a <BR>tap and is therefore not 
covered under the tap rule. This was news to me, <BR>but Wiles is considered 
some sort of guru in compliance discussions.<BR><BR>William Miller<BR><BR><BR>At 
03:43 PM 12/5/2008, you wrote:<BR><BR>>Wreches,<BR>><BR>><BR>>I have 
a system where we are tapping onto the bus bars of a 1200 amp panel <BR>>fed 
by a 1200 amp main breaker. The easy place to tap onto the bus bars <BR>>is 
the load side of the breaker using the existing 
bolts.<BR>><BR>><BR>>The inverter and utility fused disco are about 200 
ft away, and the tap <BR>>conductors travel about15ft in EMT conduit before 
leaving the <BR>>building. After that the circuit is outdoors. NEC 240.21(B)5 
allows taps <BR>>of unlimited length for conductors located outside of a 
building, except <BR>>at the point of load (in this case supply) 
termination.<BR>><BR>><BR>>Can 20ft of conductor inside the building be 
covered by being "at the <BR>>point of load termination", or do I have to 
comply with NEC 240.21(B)2 and <BR>>have an OCPD within 
25'?<BR>><BR>><BR>>The construction foreman for this project is buddies 
with the inspector, <BR>>so getting a signed permit won't be a problem but I 
want this to be a code <BR>>compliant system. Can anyone lend some insight to 
the spirit of <BR>>240.21(B)2 and 5?<BR>><BR>><BR>>Sorry if this has 
been discussed before, but searching didn't yield any 
<BR>>results.<BR>><BR>><BR>>Best,<BR>><BR>>Jerry 
Caldwell<BR>><BR>>Recurrent 
Energy<BR>><BR>>_______________________________________________<BR>>List 
sponsored by Home Power magazine<BR>><BR>>List Address: <A 
href="mailto:RE-wrenches@lists.re-wrenches.org" 
ymailto="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</A><BR>><BR>>Options 
& settings:<BR>><A 
href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" 
target=_blank>http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</A><BR>><BR>>List-Archive: 
<BR>><A 
href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" 
target=_blank>http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</A><BR>><BR>>List 
rules & etiquette:<BR>><A href="http://www.re-wrenches.org/etiquette.htm" 
target=_blank>www.re-wrenches.org/etiquette.htm</A><BR>><BR>>Check out 
participant bios:<BR>><A href="http://www.members.re-wrenches.org" 
target=_blank>www.members.re-wrenches.org</A><BR><BR><BR>_______________________________________________<BR>List 
sponsored by Home Power magazine<BR><BR>List Address: <A 
href="mailto:RE-wrenches@lists.re-wrenches.org" 
ymailto="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</A><BR><BR>Options 
& settings:<BR><A 
href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" 
target=_blank>http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</A><BR><BR>List-Archive: 
<A href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" 
target=_blank>http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</A><BR><BR>List 
rules & etiquette:<BR>www.re-wrenches.org/etiquette.htm<BR><BR>Check out 
participant bios:<BR>www.members.re-wrenches.org<BR><BR></DIV></DIV></DIV>
<DIV style="POSITION: fixed"></DIV></DIV></DIV></BODY></HTML>