<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2900.5626" name=GENERATOR></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>Kirpal,</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>The term in the tax Code is "Placed Into 
Service".</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>What is the date that the system was placed into service 
such that it can serve the purpose for which it was built?</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>Note that the date is the date on which the system is 
capable of serving the purpose, regardless of whether or not the owner chooses 
to use the system for that purpose.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>In this case, backfeeding a net meter is clearly part of 
the purpose of the system. As such the system cannot be placed into service 
until the net meter is in place.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>Hold off on the interconnection until 
January.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>Of course, this is all strictly a matter which can only be 
discussed between the owner and his tax advisor.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008><FONT face=Arial 
color=#0000ff size=2>:-)</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=406410319-03122008></SPAN> <BR><SPAN 
lang=en-us><FONT face=Arial size=2>Mark Frye</FONT></SPAN> <BR><SPAN 
lang=en-us><FONT face=Arial size=2>Berkeley Solar Electric Systems</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face=Arial size=2>303 Redbud Way</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face=Arial size=2>Nevada City,  CA 
95959</FONT></SPAN> <BR><SPAN lang=en-us><FONT face=Arial size=2>(530) 
401-8024</FONT></SPAN> <BR><SPAN lang=en-us></SPAN><A 
href="http://www.berkeleysolar.com/"><SPAN lang=en-us><U><FONT face=Arial 
color=#0000ff size=2>www.berkeleysolar.com</FONT></U></SPAN></A><SPAN 
lang=en-us><FONT face=Arial size=2> </FONT></SPAN> </DIV>
<DIV> </DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> re-wrenches-bounces@lists.re-wrenches.org 
[mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of </B>Kirpal 
Khalsa<BR><B>Sent:</B> Wednesday, December 03, 2008 11:00 AM<BR><B>To:</B> 
RE-wrenches<BR><B>Subject:</B> [RE-wrenches] system commissioning time 
frames<BR></FONT><BR></DIV>
<DIV></DIV>Greetings......we recently installed a solar pv system on a 
residential customer and it has been inspected by both the local electrical 
inspector and the state rebate authority and approved.  Now that we have 
passed those inspections, the next phase of the process is having the utility 
company come out and install their new meter for net metering......I was 
wondering if anyone has a definitive answer as to what actually commissions the 
system?  We are thinking of having the power company hold off until after 
the new year so that the customer can get the 2009 tax credits instead of the 
2008 credits.......<BR>The question is does the system get commissioned once it 
is inspected or once the power company gets the new meter installed so that the 
system can actually be turned on.....<BR>Thanks for any advice.......It actually 
could be worth its weight in gold!.......<BR>Cheers,<BR>Kirpal 
Khalsa<BR>Renewable Energy Systems<BR><A 
href="http://www.oregonsolarworks.com">www.oregonsolarworks.com</A><BR></BODY></HTML>