<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:times new roman, new york, times, serif;font-size:12pt"><DIV>It is nice to have a good working relationship with the utility, but scheduling and placing meters are just part of the job, not commissioning.<BR></DIV>
<DIV style="FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"><BR>
<DIV style="FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"><FONT face=Tahoma size=2>
<HR SIZE=1>
<B><SPAN style="FONT-WEIGHT: bold">From:</SPAN></B> David Brearley <david.brearley@solarprofessional.com><BR><B><SPAN style="FONT-WEIGHT: bold">To:</SPAN></B> RE-wrenches <re-wrenches@lists.re-wrenches.org><BR><B><SPAN style="FONT-WEIGHT: bold">Sent:</SPAN></B> Wednesday, December 3, 2008 11:19:11 AM<BR><B><SPAN style="FONT-WEIGHT: bold">Subject:</SPAN></B> Re: [RE-wrenches] system commissioning time frames<BR></FONT><BR><FONT size=4><FONT face="Calibri, Verdana, Helvetica, Arial"><SPAN style="FONT-SIZE: 11pt">Kirpal,<BR><BR>Back in 2005 when the rebates were first on the horizon, Austin Energy would voluntarily—at the request of customers—hold off placing their PV kWh meter until after January 1, 2006. The intent was to put off commissioning systems before the rebate was available.<BR><BR>Best,<BR><BR>David<BR><BR><BR>On 12/3/08 12:59 PM, "Kirpal Khalsa" <solarworks@gmail.com> wrote:<BR><BR></SPAN></FONT></FONT>
<BLOCKQUOTE><FONT size=4><FONT face="Calibri, Verdana, Helvetica, Arial"><SPAN style="FONT-SIZE: 11pt">Greetings......we recently installed a solar pv system on a residential customer and it has been inspected by both the local electrical inspector and the state rebate authority and approved.  Now that we have passed those inspections, the next phase of the process is having the utility company come out and install their new meter for net metering......I was wondering if anyone has a definitive answer as to what actually commissions the system?  We are thinking of having the power company hold off until after the new year so that the customer can get the 2009 tax credits instead of the 2008 credits.......<BR>The question is does the system get commissioned once it is inspected or once the power company gets the new meter installed so that the system can actually be turned on.....<BR>Thanks for any advice.......It actually could be worth its
 weight in gold!.......<BR>Cheers,<BR>Kirpal Khalsa<BR>Renewable Energy Systems<BR><A href="http://www.oregonsolarworks.com/" target=_blank>www.oregonsolarworks.com</A> <A href="http://www.oregonsolarworks.com/" target=_blank rel=nofollow><http://www.oregonsolarworks.com></A> <BR><BR>
<HR align=center width="95%" SIZE=3>
</SPAN></FONT><FONT face="Consolas, Courier New, Courier"><SPAN style="FONT-SIZE: 10pt"><BR><BR></SPAN></FONT></FONT></BLOCKQUOTE><FONT size=4><FONT face="Consolas, Courier New, Courier"><SPAN style="FONT-SIZE: 10pt"><BR></SPAN></FONT><FONT face="Calibri, Verdana, Helvetica, Arial"><SPAN style="FONT-SIZE: 11pt"><BR></SPAN></FONT></FONT></DIV></DIV></div></body></html>