[RE-wrenches] Minimum bus size, new requirements
William Miller
william at millersolar.com
Thu Mar 28 22:10:43 PDT 2024
Lloyd:
Thank you so much for forwarding these links. This should have been on my
radar. You saved me some time searching this out. For those who may not
be totally up-to-speed on these regulations, they make some interesting
reading.
Some will undoubtedly call them burdensome, but it in my opinion many of
the concepts are well-founded. For example, I have been known to whine
when roof area is not available for solar panels. This is addressed. I
have also been pretty pathetic when breaker space is not available for
back-feed, This too is addressed. Segregated, essential load panel? It’s
in there. There are a lot of provisions that will make it easier to do our
jobs.
Reading through this mandate may raise hackles for some who do not like to
be told how to do their jobs. We all know it is difficult to adapt to new
regulations. Having just skimmed them, I like what is being laid down.
William
Miller Solar
17395 Oak Road, Atascadero, CA 93422
805-438-5600
www.millersolar.com
CA Lic. 773985
*From:* Lloyd Hoffstatter [mailto:lloyd at sunstruckconsulting.com]
*Sent:* Thursday, March 28, 2024 11:34 AM
*To:* william at millersolar.com; RE-wrenches
*Subject:* Re: [RE-wrenches] Minimum bus size, new requirements
William,
Here is the CA Energy Code with the upsized busbar requirements under solar
/ ess readiness:
https://title24energyreports.com/articles/basic-facts-changes-2022-energy-code.php
Best regard
Title 24: 2022 Energy Code - Basic Facts | CompuCalc
<https://title24energyreports.com/articles/basic-facts-changes-2022-energy-code.php>
Summary of changes and updates in the 2022 California Energy Code
title24energyreports.com
Lloyd Hoffstatter, M.S. Applied Solar Energy
Inaugural NABCEP Cetrified PV Installer Emeritus
Director, Sunstruck Consulting
lloyd at sunstruckconsulting.com
845-657-8132 (office)
914-844-3404 (cell)
------------------------------
*From:* RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org> on behalf
of William Miller via RE-wrenches <re-wrenches at lists.re-wrenches.org>
*Sent:* Thursday, March 28, 2024 1:00 PM
*To:* RE-wrenches <re-wrenches at lists.re-wrenches.org>
*Cc:* William Miller <william at millersolar.com>
*Subject:* [RE-wrenches] Minimum bus size, new requirements
Friends:
A local building official recently wrote this:
This is to comply with the new codes (California Energy Code and the Nation
Electric Code) that require this minimum buss rating regardless of the
service size or main size.
The new code allegedly requires a minimum bus rating of 225A in all new
services of 200A rating or less.
Do any of you know what new code this might be?
Thanks in advance for your time.
William
Miller Solar
17395 Oak Road, Atascadero, CA 93422
805-438-5600
www.millersolar.com
<https://urldefense.proofpoint.com/v2/url?u=http-3A__www.millersolar.com_&d=DwMFaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=p2tHyHEAjVe2zSh4C_236V4KkHnn0z0ynUvWz0mobds&m=9uejohzp8xlaOjgzFRzK5pSkQX5Jtrq-KM0zg-kn9sGvQF-Ezmo9hA2K0hbNA1ns&s=7RIp61FIGVkUrnLeJuaaLlwwPwqGeMEQXVgB04GNECk&e=>
CA Lic. 773985
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20240328/e172c1ae/attachment.htm>
More information about the RE-wrenches
mailing list