I have had engineering done for 90 MPH/ 3 Sec microburst wind years ago for a similar wetland type of situation. We were using 6" concrete slabs poured in parallel to accommodate front & rear legs of the ground mount. 1 slab per front 7 rear set each.
The magic # was 18#of concrete per sqft of module to safely counteract the 90 MPH/ 3 Sec microburst uplift.
Please do not take my word for this; CYA & have your own engineering done but this worked well & is still in operation.

Note; I tried to apply this method in a different county in a wetland situation and was denied.


Dana Orzel - 2087217003 - 76dana58 at gmail.com

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20240322/8f9d1c83/attachment.htm>
-------------- next part --------------
An embedded message was scrubbed...
From: Kristopher Schmid via RE-wrenches <re-wrenches at lists.re-wrenches.org>
Subject: [RE-wrenches] Ballasted ground mounts
Date: Thu, 21 Mar 2024 17:12:58 +0000
Size: 10935
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20240322/8f9d1c83/attachment.eml>


More information about the RE-wrenches mailing list