[RE-wrenches] PG&E NEM_MT
William Miller
william at millersolar.com
Thu Sep 21 12:42:06 PDT 2017
Dear California wrenches:
I am applying to PG&E for connection for a Grid-Tied Battery Backup using
SMA SI4548 inverters. PG&E is asking the questions below and I am not sure
how to answer them. (I know, 3 is totally vague).
Have any of you jumped through these hoops? Any insight will be much
appreciated.
1. Current Fault Duty?
2. Short-Circuit-Interrupting-Rating (SCIR)?
3. Questions on the Energy-Storage-Battery (ESB) System
Sincerely,
William Miller
[image: Gradient Cap_mini]
Lic 773985
millersolar.com <http://www.millersolar.com/>
805-438-5600
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20170921/b9652b01/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 1777 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20170921/b9652b01/attachment-0003.jpg>
More information about the RE-wrenches
mailing list