[RE-wrenches] Load testing Lithium battery bank
Ray Walters
ray at solarray.com
Tue Mar 17 13:35:10 PDT 2015
Hi James;
So couldn't Larry weld in rigid conduit fittings? Aren't they NPSM, or
do I have that wrong? I suppose the Zinc plating would make a messier
weld and possibly be poisonous....
Also to Chris Mason, I was not aware that load banks were available for
rent. That sounds like a good option to consider. Do you have a
recommendation on who rents those?
3rd response to Jarmo: do you have any pictures of the Li+ thermal
issues? Are we talking structure fire potential, or just destruction of
the batteries themselves?
Is this another reason not to use plywood battery boxes?
R.Ray Walters
CTO, Solarray, Inc
Nabcep Certified PV Installer,
Licensed Master Electrician
Solar Design Engineer
303 505-8760
> Note that water heater elements are NPSM (National Pipe Straight
> Mechanical) and not NPT. So you need that type of half coupling or
> "bung" to weld in. The vegi-oil people seem to have this sort of stuff
> as they build water heater elements into things.
>
>