[RE-wrenches] Using legacy modules on micro-inverters

Nick Soleil nsoleil at enphaseenergy.com
Mon Sep 30 09:55:38 PDT 2013


Hi wrenches,

The M250 is not limited to 60 cell modules only.  The M250 has an expanded
voltage window which will allow for it to be paired with a wider range of
modules.  Enphase has an online module compatibility calculator which can
be used for checking a specific pairing in a specific location, at:

 http://enphase.com/module-compatibility-calculator-m250-update/.

Keep in mind that many of the high efficiency, higher voltage, 72 cell
modules will not be compatible.



On Sat, Sep 28, 2013 at 6:45 AM, Jay Peltz <jay at asis.com> wrote:

> Hi Bill
>
> Is there a new M250?
> Enphase shows the 250 at 48vdc max and states 60 cell only modules.
>
> That would be nice if it did both
>
> Jay
>
> Peltz power.
>
>
>
> Sent from my iPhone
>
> On Sep 27, 2013, at 10:14 AM, "Bill Brooks" <billbrooks7 at yahoo.com> wrote:
>
> William,****
>
> ** **
>
> Just to add one more thing. I said that the M215 does not match well, but
> if you have them on hand, they would still work. You will probably power
> limit in the spring and fall, but the rest of the year you will probably do
> fine. The M250 has a higher operating voltage for 72-cell arrangements. The
> M215 is more suited for 60-cell modules and circuits.****
>
> ** **
>
> Bill.****
>
> ** **
>
> ** **
>
> *From:* re-wrenches-bounces at lists.re-wrenches.org [
> mailto:re-wrenches-bounces at lists.re-wrenches.org<re-wrenches-bounces at lists.re-wrenches.org>]
> *On Behalf Of *William Miller
> *Sent:* Thursday, September 26, 2013 10:01 PM
> *To:* RE-wrenches
> *Subject:* [RE-wrenches] Using legacy modules on micro-inverters****
>
> ** **
>
> Friends:****
>
> ** **
>
> I am trying to upgrade a long time off-grid client to a grid-connected
> installation.  They have a mix of Siemens PC4JF and Shell SQ-150P modules.
> It is my understanding that putting two of the PC4JFs in series is exactly
> one SQ-150.  I don’t have spec sheets for the PC4JFs but I am told they are
> an SP75.  If I use the data for the SP75 and multiply the voltages by two I
> get exactly a SQ-150P.****
>
> ** **
>
> Anyway, putting two 36 modules together makes one 72 cell module.  This
> would likely work with an Enphase M190 but those are no longer
> manufactured.  Same with the M215.  Power One makes a micro that meets the
> predicted voltage window.****
>
> ** **
>
> I did this a while ago with pairs of SR100s.  It worked great.  Anyone try
> this with even older modules, like those cited???****
>
> ** **
>
> Thanks in advance.****
>
> ** **
>
> William Miller****
>
> ** **
>
> _______________________________________________
>
> List sponsored by Home Power magazine
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out participant bios:
> www.members.re-wrenches.org
>
>
> _______________________________________________
> List sponsored by Home Power magazine
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out participant bios:
> www.members.re-wrenches.org
>
>
>


-- 

Cordially,

*Nick Soleil*

*Field Applications Engineer
*

*Enphase Energy*

Mobile: (707) 321-2937


**

*Enphase Commercial Solar.*
*Limitless.*<http://www.enphase.com/commercial?utm_source=email&utm_medium=sig&utm_campaign=Comm2012>

*
*<http://www.enphase.com/commercial?utm_source=email&utm_medium=sig&utm_campaign=Comm2012>

1420 North McDowell

Petaluma, CA 94954

www.enphase.com <http://www.enphaseenergy.com/>

P: (707) 763-4784 x7267

F: (707) 763-0784

E: nsoleil at enphaseenergy.com

[image: nabcep logo] Certified Solar PV Installer #03262011-300

“Don’t get me wrong: I love nuclear energy! It’s just that I prefer fusion
to fission. And it just so happens that there’s an enormous fusion reactor
safely banked a few million miles from us. It delivers more than we could
ever use in just about 8 minutes. And it’s wireless! .”

- William McDonough



This email message is for the sole use of the intended recipient(s) and may contain confidential and/or privileged information. If you are not an intended recipient, you may not review, use, copy, disclose or distribute this message. If you received this message in error, please contact the sender by reply email and destroy all copies of the original message. 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20130930/349a8c97/attachment-0003.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 1981 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20130930/349a8c97/attachment-0003.jpg>


More information about the RE-wrenches mailing list