[RE-wrenches] Critical Loads Panel Wiring
Darryl Thayer
daryl_solar at yahoo.com
Tue May 8 06:42:33 PDT 2012
Locally if you have two service panels next to each other, inspectors want both bonded and grounded, by allowing a bonding jumper from panel one to panel 2, and both panesl use the bonding screw, and both have to have a neutral bus.
________________________________
From: Corey Shalanski <cshalanski at joule-energy.com>
To: RE-wrenches at lists.re-wrenches.org
Sent: Tuesday, May 8, 2012 6:51 AM
Subject: [RE-wrenches] Critical Loads Panel Wiring
Wrenches,
Batt backup system: When placing a critical loads panel directly adjacent to the main service panel (in the next stud bay), must the neutral and ground conductors be pulled into the new subpanel? or can only the hots be pulled? Any Code references would be appreciated.
--
Corey Shalanski
Joule Energy
New Orleans, LA
_______________________________________________
List sponsored by Home Power magazine
List Address: RE-wrenches at lists.re-wrenches.org
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20120508/240ce169/attachment-0003.html>
More information about the RE-wrenches
mailing list