[RE-wrenches] Off-Grid to Grid-Connected -essential loads

benn kilburn benn at daystarsolar.ca
Fri May 4 14:08:44 PDT 2012


Wrenches,I have an off-grid client who is going to be connecting to the grid.  Since the system (~9 kW of PV and ~2400 Ah battery) is already well suited for the loads, I am wondering about the necessity of an essential loads panelboard.  I'm not sure if I see the need since the battery is already sized for all the existing loads.
The intent is to continue running all the loads from the battery and have the (Outback) settings so that the grid is only used when the PV isn't able to maintain a particular battery voltage setting.  
Comments, insights into this type of set-up?
Thanks,benn
DayStar Renewable Energy Inc. www.daystarsolar.ca780-906-7807 Certified Construction Electrician Solar Photovoltaic Systems CertifiedCertificate # 0007SHAVE A SUNNY DAY 		 	   		  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20120504/ed631c6d/attachment-0002.html>


More information about the RE-wrenches mailing list