At 03:16 PM 12/24/2011, you wrote:
>On another project, we have previously replaced a similar type fused
>main switch with a Eaton Solar Ready Loadcenter with 225A rated buss
>and 200A main breaker in order to be able to backfeed max. 70 A of
>PV. I am leaning towards doing the same on this one
That sounds like the best solution to me. Most of the existing
equipment sounds pretty marginal.