[RE-wrenches] PG&E Interconnection Agreement Equipment Changes
Jason Szumlanski
Jason at fafcosolar.com
Sat Aug 20 10:29:52 PDT 2011
That information should be in the original agreement. Do you have a
copy? In Florida, FPL only requires that you notify them if you increase
the gross power rating, defined as the DC-STC array rating times 0.85.
Jason Szumlanski
Fafco Solar
From: re-wrenches-bounces at lists.re-wrenches.org
[mailto:re-wrenches-bounces at lists.re-wrenches.org] On Behalf Of Mark
Frye
Sent: Saturday, August 20, 2011 11:21 AM
To: 'RE-wrenches'
Subject: [RE-wrenches] PG&E Interconnection Agreement Equipment Changes
Folks,
Has anyone talked with PG&E about needing (or not needing) a new
Interconnection Agreement when changing out inverter make and model
without increasing the size of the PV generator (number of modules) on a
system that is already interconnected?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com <http://www.berkeleysolar.com>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20110820/3bc3c744/attachment-0004.html>
More information about the RE-wrenches
mailing list