[RE-wrenches] High Voltage MPPT units; Adding battery backup

maverick at mavericksolar.com maverick at mavericksolar.com
Wed Nov 9 19:55:22 PST 2011


I googled "600 volt switch dual throw" and found a cutler-hammer DT363URK.

From http://www.alliedelec.com/Images/Products/Datasheets/BM/EATON_CUTLER_HAMMER/416-0447.PDF

Not sure if it carries a DC rating all the way to 600v. 


 



Thank you,

Maverick


Maverick Brown
BSEET, NABCEP Certified Solar PV Installer ®
President & CEO
Maverick Solar Enterprises, Inc.
Office:     512-919-4493
Cell:        512-460-9825

Sent from my HondaJet!

On Nov 9, 2011, at 6:07 PM, "Larry Crutcher,Starlight Solar Power Systems" <larry at starlightsolar.com> wrote:

> Right.... a major rewire and many components...and sacrifices. The Outback is limited to 30 amps AC and cost much more than you would need to spend. 
> 
> With my idea you just add a transfer switch....Done. When the grid is down, PV feeds HV CC. Then you can use ANY size inverter, with or without a transfer switch. No rewiring the grid inverter. No 240 volt transformers or dual inverters. No relays, switches or diversion controllers. Batteries are always properly maintained. No phantom loads. Very simple. 
> 
> Thanks for your input. Now if I can just find that darn 600 volt transfer switch.
> 
> Larry Crutcher
> Starlight Solar Power Systems
> 
> 
> 
> On Nov 9, 2011, at 1:55 PM, Drake wrote:
> 
>> Any amount of power will AC couple.  
>> 
>> If you use an off grid inverter, such as an Outback, to feed the protected load panel, the inverter should be fed by grid AC power to supply loads, when the grid is available.  Just feed  your grid tie inverter into the protected loads panel.   You will need a relay to shut off power from the grid tie inverter when the batteries are full.  This can be triggered by the fan relay in the Outback. 
>> 
>> The on grid inverter will push power into the grid through the battery inverter's internal transfer switch during normal operation and AC couple when the power is out.  If your grid tie inverter is 240 volts, you will need to use a transformer or two inverters.  
>> 
>> The phantom load of the inverter can be eliminated by using a transfer switch to send PV power straight to the grid, during normal grid availability, keeping the inverter turned off.  AC coupling seems much easier than using a charge controller, but there is no conditioning of the batteries.  The charge is just on and off at the voltage set point. For a back up system, that is not much of a problem, as the battery inverter can maintain the batteries when power is available. 
>> 
>> 
>> 
>> At 02:04 PM 11/9/2011, you wrote:
>>> Nice Find, Drake! Thanks. 
>>> 
>>> What is the minimum system for an AC coupled inverter? 
>>> 
>>> Again, the idea is for low cost battery backup of an existing grid tie. The AC coupled schematics I have looked at require a major rewire and many components. I would like to hear if someone has a simple add on solution compared to just switching the array to the high voltage CC.
>>> 
>>> Larry Crutcher
>>> Starlight Solar Power Systems
> _______________________________________________
> List sponsored by Home Power magazine
> 
> List Address: RE-wrenches at lists.re-wrenches.org
> 
> Options & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
> 
> List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
> 
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
> 
> Check out participant bios:
> www.members.re-wrenches.org
> 
-------------- next part --------------