[RE-wrenches] maximum efficiency module inquiry
Joel Davidson
joel.davidson at sbcglobal.net
Mon Jul 19 07:56:35 PDT 2010
Hello Kirk,
See champion cell efficiencies in slide 11 at http://www.nrel.gov/docs/fy09osti/44201.pdf
When price is no object, some solar vehicles have used space program gallium arsenide cells. See http://photovoltaics.sandia.gov/docs/PVFSCGallium_Arsenide_Solar_Cells.htm
Joel Davidson
----- Original Message -----
From: Kirk Herander, VSE
To: 'RE-wrenches'
Sent: Monday, July 19, 2010 6:34 AM
Subject: Re: [RE-wrenches] maximum efficiency module inquiry
Peter, Keith,
What I / they are interested in is max kwh/day in their climate. I don't know what they are willing to pay or receive for being a beta site, the first step is to see what's out there and what it takes to get it installed if appropriate. This customer is an outside-the-box thinker that doesn't often take no for an answer, and maximum energy harvest will trump the cost.
The site is in the Mid-Atlantic U.S. - it is common for temps to be in the upper 90's with high humidity in summer. Delivery would occur in mid 2011.
Kirk Herander
Vermont Solar Engineering
802.863.1202
NABCEP(tm) Certified Solar Installer
NYSERDA-eligible Installer
VT Solar Incentive Program Partner
------------------------------------------------------------------------------
From: re-wrenches-bounces at lists.re-wrenches.org [mailto:re-wrenches-bounces at lists.re-wrenches.org] On Behalf Of Peter Parrish
Sent: Sunday, July 18, 2010 1:08 PM
To: 'RE-wrenches'
Subject: Re: [RE-wrenches] maximum efficiency module inquiry
Hi Keith,
A few que[#] stions:
(Q1) How much is your client willing to pay for the most efficient module (module not cell)?
(Q2) If they are willing to be a beta site, what would they be willing to do (or agree to let happen) of value in return?
(Q3) What is the average high temperature at the site in question for June, July, August and September?
(Q4) When would they/you want to take delivery?
The real question behind Q3 is "why are they/you focussed on efficiency, and not kWh/kWdc/year or $/kWdc/year or IRR"?
Based on where your client is coming from, I may be of help.
Regards,
- Peter
Peter T. Parrish, Ph.D., President
California Solar Engineering, Inc.
820 Cynthia Ave., Los Angeles, CA 90065
CA Lic. 854779, NABCEP Cert. 031806-26
peter.parrish at calsolareng.com
Ph 323-258-8883, Mobile 323-839-6108, Fax 323-258-8885
------------------------------------------------------------------------------
From: re-wrenches-bounces at lists.re-wrenches.org [mailto:re-wrenches-bounces at lists.re-wrenches.org] On Behalf Of Kirk Herander, VSE
Sent: Saturday, July 17, 2010 11:57 AM
To: 'RE-wrenches'
Subject: [RE-wrenches] maximum efficiency module inquiry
Hello,
I have been charged with the task by a corporate client to do diligence in finding the most efficient PV out there which is commercially available, or may be available in the next five years. They are not satisfied with the roughly 20% efficiency of Sanyo / Sunpower, for instance. They want the greatest power density available and may be willing to serve as a beta test site for something of highest efficiency, and money may not be an object. The roof footprint can accommodate roughly 85KW of Sanyo 210's as it looks today.
Any info you folks can provide would be greatly appreciated. I basically need to write a white paper describing everything out there and the pros and cons of each. It is possible I could hire a consultant (recommended by or from our wrench list) to do this research for me if it feels right. I imagine this type of analysis has been done before. Thanks in advance.
Kirk Herander
Vermont Solar Engineering
802.863.1202
NABCEP(tm) Certified Solar Installer
NYSERDA-eligible Installer
VT Solar Incentive Program Partner
------------------------------------------------------------------------------
_______________________________________________
List sponsored by Home Power magazine
List Address: RE-wrenches at lists.re-wrenches.org
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20100719/9dd01388/attachment-0004.html>