[RE-wrenches] Nec 225
William Miller
william at millersolar.com
Fri Dec 11 18:27:41 PST 2009
Dick:
I too am mystifed. I sent a request for clarification but have not
heard back. It may be some kind of power trip as we have been at odds
over many issues. I will report back.
William Miller
Millersolar.com
On Dec 11, 2009, at 6:05 PM, Richard.L.Ratico at VALLEY.NET (Richard L
Ratico) wrote:
> William,
>
> No direct specific experience with this, but, respectfully, what is
> the problem?
> The code sections seem clear and not unreasonable nor arduous.
>
> Dick Ratico
> Solarwind Electric
>
>
> --- You wrote:
> Friends:
>
>
> I just received a plan correction for a grid-tie permit application
> wherein
> the inspector is questioning compliance with section 225. Below is
> the
> text of the correction notice:
>
> The existing panel C in the pump house must comply with NEC 225.31. 225.32
> & 225.33. Show the number of existing circuits and/or the
> disconnecting
> means for panel C.
>
> Has anyone ever had experience with this section being applied to a
> grid-tie system? The inverters will be inside a pump house remote
> from the
> main residence.
>
> Thanks in advance.
>
> William Miller
>
> --- end of quote ---
> _______________________________________________
> List sponsored by Home Power magazine
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Options & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out participant bios:
> www.members.re-wrenches.org
>
More information about the RE-wrenches
mailing list