Absolutely, the operating environment and temperature is higher than a panel mounted 3" off the roof deck. There are some roofing methods intended to help minimize the heat buildup, but nothing beats air flow. You can used what is called an elevated or counter batten system to help with air flow under the tiles. Some counter batten systems can achieve a 2 - 4" air gap under the tiles. The back of the roof tile has an open web design that allows air to flow across the back tedlar sheet.
 
I think that there is some de-rating incorporated into the PTC value of the tile, but was not involved in that portion of the testing. I tend to use a 40° addition to the expected ambient air temperatures when calculating string Voltages.
 
Brian C. White
Sr. Design Engineer - PV System
 
Eagle Roofing Products
120 North Auburn Street - Suite 212
Grass Valley, CA  95945
Phone: 530-273-2948
Cell: 530-575-5550
e-mail: brianw at eagleroofing.com <mailto:brianw at eagleroofing.com> 
 
 

________________________________

From: re-wrenches-bounces at lists.re-wrenches.org on behalf of Antony Tersol
Sent: Tue 3/31/2009 1:08 PM
To: re-wrenches at lists.re-wrenches.org
Subject: Re: [RE-wrenches] RE-wrenches Digest, Vol 2, Issue 364


Since the tiles are the roof, how does increased temperature affect production?  What factor do you use to reflect the decrease in production as compared to PV modules mounted on racks at 3+" above the roof?  





	Message: 1
	Date: Tue, 31 Mar 2009 11:11:46 -0700
	From: "Brian White" <brianw at eagleroofing.com>
	Subject: Re: [RE-wrenches] PV shingles again
	To: "RE-wrenches" <re-wrenches at lists.re-wrenches.org>
	Message-ID:
	       <7B501A61B33B934DAB214DB9FAF493B132A05C at BIExchange.BurlingameIndustries.com>
	
	Content-Type: text/plain; charset="iso-8859-1"
	
	We are using the Open Energy / Applied Solar Inc. roof tile, but I guess it is not a shingle technically speaking. The product is better suited to new construction (90% of our business) than retro-fits when it comes to cost. One thing that you have to remember when selling a tile product is that you are offsetting some of the cost associated with the roof, i.e. roofing material and installation. With the tile product from OE / ASI (which is actually manufactured and warranted by Suntech) it does not go on the roof, it is the roof, class A rating and everything.
	
	To all getting ready to send me an e-mail about marketing, I am not trying to sell the product, but did help design it when I worked for them, so I have first hand experience.
	
	Someone made a comment about running conduit from one tile to the next. We do not view this requirement the same, and do not install any type of conduit above the roof. The requirement for metal conduit states that metal conduit has to be used from the point of building "penetration" to the first disconnect.
	
	The one advantage that I really enjoy, is that with the tile, it makes system sizing much easier as far as string Voltage is concerned. Each tile is a 6.07 Voc, so you can just add or subtract as many tiles as needed to get to the sweet spot of the inverter.
	
	My 2 cents.
	
	(to all, my apologies if that funky attachment comes with my e-mail that I was informed of previously, it has something to do with my remote access, and is not harmful)
	
	Best Regards,
	Brian C. White
	Sr. Design Engineer - PV System
	
	Eagle Roofing Products
	120 North Auburn Street - Suite 212
	Grass Valley, CA  95945
	Phone: 530-273-2948
	Cell: 530-575-5550
	e-mail: brianw at eagleroofing.com <mailto:brianw at eagleroofing.com>
	
	
	
	


-------------- next part --------------
A non-text attachment was scrubbed...
Name: winmail.dat
Type: application/ms-tnef
Size: 7835 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20090331/0c8cd873/attachment-0007.bin>


More information about the RE-wrenches mailing list