[RE-wrenches] grid tie sync with big stiff genny?
Kurt Albershardt
info at es-ee.com
Fri Mar 13 09:50:50 PDT 2009
On 3/13/09 9:34 AM, Mark Edmunds wrote:
>
> We did a test installation in northern British Columbia with 28kW of
> PV and GT5 inverters selling to a 90kW Genny system in a remote
> off-grid community. So far we have just stuck to the normal 1741
> islanding settings, and the system has been working smoothly. The PV
> was basically sized so that it would not exceed the lowest mid-day
> load on the small grid, and there was already an automatic dump load
> in the system to ensure the diesels never became completely unloaded.
>
> So far the system has been working very well, with good fuel saving
> for the community. You can read more about it here.
>
> http://nemiahpower.blogspot.com/
>
Looks like a fun project. I like the separation of cricical,
commercial, and residential loads (especially the UK style pay-as-you-go
metering on the residences.) I know those air-cooled Deutzes are hard
to kill, but this looks like a perfect application for water-cooled
machines feeding a district heat loop.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20090313/79eb768b/attachment-0003.html>
More information about the RE-wrenches
mailing list