[RE-wrenches] Multi-structure PV install

Marv Dargatz mdargatz at enphaseenergy.com
Tue Dec 30 17:07:29 PST 2008


Kurt,

You definitely need the dedicated branch circuit protection.  Beyond 
that, it's up to your local AHJ.  Same for the labeling.  Of course, NEC 
690.54 and 690.56B do require a label at the point of interconnection.

See Ya!

Marv
Enphase Energy
707 763-4784 x7016

Kurt Albershardt wrote:
> --On Monday, December 29, 2008 8:29 AM -0800 Marv Dargatz 
> <mdargatz at enphaseenergy.com> wrote:
>>
>> The NEC provides for, and the AHJs have accepted the use of the 
>> connectors as a form of disconnect.  Of course, each branch is also 
>> connected to a dedicated branch overcurrent device (circuit breaker).
>>
>> On the DC side, since only one module is connected to each inverter, 
>> the connectors also serve as a means of disconnect.  The DC wiring 
>> does not enter the building, so a separate DC disconnect is not required.
> 
> Right, no problems foreseen there.
> 
> 
>> What specific questions do you have about labeling?
> 
> Five small arrays, each on a different structure, feeding one production 
> meter (located on one of the structures or perhaps on a separate 
> outbuilding.)  Do I put a small breaker/disconnect (I'm thinking a 
> 2-space 3R panel) on each structure and label (how)?
> 
> thanks...
> 
> 
> 
> 
> 
> _______________________________________________
> List sponsored by Home Power magazine
> 
> List Address: RE-wrenches at lists.re-wrenches.org
> 
> Options & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
> 
> List-Archive: 
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
> 
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
> 
> Check out participant bios:
> www.members.re-wrenches.org
> 
> 
> 



More information about the RE-wrenches mailing list