[RE-wrenches] Multi-structure PV install

Kurt Albershardt info at es-ee.com
Mon Dec 29 11:25:16 PST 2008


--On Monday, December 29, 2008 10:06 AM -0700 Jason Lombard <openhandsolar at gmail.com> wrote:
>
> I worked on a elderly housing site in northern Ca in which we connected to the main service on each structure (total of 12) or building.

I'm assuming all those buildings have service billed to the same entity?


> The nice thing about CA is they use only one meter which is a bi-directional digital system so the production meter was not needed.

NM has production based RECs, so the separate meter is our friend.  I'm hoping I don't have to install five production meters.  The individual building services are billed to the tenants, but the owner wants the RECs.